Similar Projects
Akins Boulevard Extension Project
Infrastructure, Alteration
Bidding
$700,000 est. value
Statesboro, GA 30458

T32-D3 Sweeping and Drain Cleaning
Infrastructure
Bidding
Vienna, GA

Davis Street and West Walker Street Drainage and Headwall Project
Post-Bid
Thomaston, GA 30286

Lee Street Lift Station and Associated Improvements
Post-Bid
Valdosta, GA 31601

Knight Road Culvert Replacement
Results
Rutledge, GA 30663

Pike County CDBG19 - Storm Drainage and Street Improvements, Hill Top Community
Results
Less than $515,000 est. value
Zebulon, GA 30295

T32-D6 Sweeping and Drain Cleaning
Term Contract
Bidding
Atlanta, GA

North 4Th Avenue Drainage And Sidewalk Improvements
Post-Bid
Rome, GA

Irwin County 2020 LMIG Mcneil Drive
Results
Less than $79,977 est. value
GA

Cured in Place Pipe (CIPP) and Upgrades to Lift Stations
Infrastructure
Bidding
$400,000 est. value
Kingsland, GA

East Gordon Street Drainage Improvements
Post-Bid
Douglas, GA 31533

Little Buffalo Creek Road
Results
Hickox, GA 31553

Culvert Construction at Amicalola Falls
Infrastructure
Bidding
$500,000 est. value
Dawsonville, GA 30534

Terminal Area Expansion Grading and Drainage Phase 1A
Post-Bid
Dallas, GA 30157

Concrete Culvert - School House Road
Results
$214,662 est. value
Cedartown, GA 30125

Reported 06/01/2022 01:49 AM
Project Title

TSA Modular Stormwater Drainage System

Physical Address View project details and contacts
City, State (County) Brunswick, GA   (Glynn County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Pre-Solicitation, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $825,658 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes Storm water collection basin with an integrated trench drain that drains to a new dual wall 8-inch diameter HDPE culvert to be installed near the existing 8-inch HDPE culvert behind Building 714, draining to the roadside ditch along Artesia Avenue. This system is for the FLETC TSA Modular Campus, it will be parallel to the sidewalk near Building 710 and turn to be perpendicular to the sidewalk to align with the existing 8-inch HDPE culvert behind Building 714, The work shall be for the stormwater system and incidental related work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents