Similar Projects
Bibich Elementary School - Lake Central School Corp.
Renovation
Conception
$17,000,000 CJ est. value
Dyer, IN 46311

Bid Package #3 - Additions and Renovations to Bibich Elementary - Mechanical/Electrical Package
Addition, Demolition, Renovation, Infrastructure
Design
$3,238,550 CJ est. value
Dyer, IN 46311

Winfield Elementary School 2023 Additions, Renovations, and Related Work
Addition, Demolition, Renovation, Infrastructure - 84,643 SF
Bidding
$5,146,000 CJ est. value
Crown Point, IN 46307

2023 High School Renovation and District-Wide Facility Improvement Project
Build-out, Renovation
Bidding
$6,105,000 CJ est. value
Munster, IN 46321

Stadium Rehabilitation
Renovation
Post-Bid
Merrillville, IN 46410

Douglas MacArthur ES
Renovation, Addition
Post-Bid
Cedar Lake, IN 46303

Flight Type Dish Machine
Renovation, Addition, Term Contract
Results
Merrillville, IN 46410

Crown Point High School
Renovation, Addition
Results
$42,500,000 est. value
Crown Point, IN 46307

Crown Point Christian School Classrooms
Addition
Construction
$2,000,000 est. value
Saint John, IN 46373

New Administration Center, Alternative Education and Resource Center and Related Work
New Construction, Infrastructure
Construction
$19,869,043 CJ est. value
Crown Point, IN 46307

Crown Point Christian School Classrooms Phase II
Addition
Pending Verification
$2,000,000 est. value
Saint John, IN 46373

Munster High School - North Classrooms Interior Renovations
Renovation
Bidding
$350,000 CJ est. value
Munster, IN 46321

New Construction
New Construction
Post-Bid
Schererville, IN 46375

Progressive Design-Build Contract 2021 Early Learning Center
New Construction
Results
Gary, IN 46410

D/B - 2022 School Facilities Improvements Project
New Construction
Post-Bid
$11,800,000 est. value
Griffith, IN 46319

Last Updated 04/05/2023 05:18 PM
Project Title

Security Vestibules at Central High School and Harrison Elementary

Physical Address View project details and contacts
City, State (County) East Chicago, IN 46312   (Lake County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $680,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Security Vestibules at Central High School and Harrison Elementary Project Location: Cental High School (1100 W. Columbus Dr, East Chicago, IN 46312), Harrison Elementary School (4411 Magoun Ave, East Chicago IN 46312). Work shall be performed under one Unified Contract. Bid Security shall be in the amount of not less than five percent (5%) of the total price and delivered in a sealed envelope showing the Bidder's name and address.' Should a successful Bidder withdraw the Bid, or fail to execute a satisfactory Contract, the Owner may then declare the Bid deposit forfeited as liquidated damages. Bidder receiving the award shall furnish an approved one hundred percent (100%) Performance Bond and a one hundred percent (100%) Labor and Materials Payment Bond which cover faithful performance of the Contract and the payment of all obligations arising thereunder. Said bonds shall remain in full force and effect for twelve (12) months from the date of acceptance of the Work. The Contract to which the Owner will be a party will contain a provision prohibiting the other party to the Contract, and their subcontractors, from engaging in employment practice that constitutes a discrimination against a person because of the person's race, color, sex, religion, national origin or ancestry. The Contractor shall provide an affidavit with each billing, assuring the Owner that this provision has not been violated. The Owner reserves the right to accept or reject any Bid, to waive any informalities or errors in bidding for a period of sixty (60) days after the Bid opening.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents