Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Specifications For Electrical Construction Repair To Damaged Utility Lines In Post Disaster Environment
Post-Bid
Moore Haven, FL

Hanger Fans
Term Contract
Post-Bid

Generator Preventative Maintenance Services (Region 3)
Term Contract
Results
Lakeland, Largo, Orlando, Saint Petersburg, Tampa, FL 32801

Relocate Airfield Electrical Vault
Results
$3,211,905 est. value
Clearwater, FL 33762

Holiday Lighting Services
Alteration
Post-Bid
Seminole, FL 33772

Electrical Thermographic Infrared Scan and Window Installation
Term Contract
Results
$304,283 est. value
FL

MATOC IDIQ for Control Systems Installations at Hydroelectric Facilities for The U.S. Army Corps of Engineers, South Atlantic Division
Term Contract
Post-Bid
Less than $20,000,000 est. value

Transfer Switch
Results
Tarpon Springs, FL

Storm Rates Overhead Line Construction 2022
Infrastructure
Post-Bid

Generator System Addition
Results
Palm Harbor, Saint Petersburg, FL 34683

Generator System Addition
Alteration
Post-Bid
Palm Harbor, Saint Petersburg, FL 34683

Yaskawa Variable Frequency Drives
Results
Clearwater, FL 33759

Electrical Upgrades at Lakeside Terrace Apartments
Alteration
Post-Bid
Pinellas Park, FL 33781

Emergency Generator Installation and Traffic Signal Repair
Results
$2,000,000 est. value

Last Updated 08/30/2022 12:33 AM
Project Title

Median Modification/Add Turn Lane/Traffic Signals/Drainage Improvements

Physical Address View project details and contacts
City, State (County) St Petersburg, FL 33702   (Pinellas County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $6,182,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Pinellas Road Name: SR 687 (US 92) (4th St N) Limits: From 30th Ave N to 94th Ave N Project(s): 43940115201(*) Federal Aid No: D722021B Total Roadway Length: 3.986 Miles Contract Days: 375 Total Bridge Length: 0.000 Miles Total Proposal Length: 3.986 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Calendar Days The improvements under this contract consist of the extension of left-turn storage lanes, modification and elimination of median openings, the addition of a new turn lane and the construction of pedestrian signals and crosswalks at nine locations on SR 687 (US 92) (4th St. N) For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 012 - Median Modification/Add Turn Lane/Traffic Signals/Drainage Improvements

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents