Similar Projects
Trenchless Sanitary Sewer Rehabilitation
Infrastructure
Bidding
Rapid City, SD

Sewer Force Main Air Release Valve Replacement Haines Avenue
Infrastructure
Bidding
Rapid City, SD 57703

South Street Sewer Extension
Post-Bid
Rapid City, SD 57701

East 1st Street Extension
Post-Bid
$4,000,000 est. value
Tea, SD 57064

Gateway Boulevard (CR106) Phase 2 Improvements
Results
Less than $14,500,000 est. value
Tea, SD 57064

Theodore Roosevelt National Park Replace HQ Sewer
Results
$250,000 to $500,000 est. value
Keystone, SD

Sewer Vacuum and Pumping Equipment
Term Contract
Bidding
$65,000,000 est. value

2021 Sanitary Sewer CIPP Lining
Post-Bid
Spearfish, SD 57783

33rd Street and Minnesota Avenue Intersection Reconstruction, Utility Improvements, Pavement Repairs and ADA Improvements
Results
Less than $1,760,000 est. value
Sioux Falls, SD

Sanitary Sewer System Improvements
Infrastructure
Bidding
$800,000 est. value
Montrose, SD

Streeter Drive Realignment
Post-Bid
$1,281,000 est. value
North Sioux City, SD

Abandon Omaha Trunk Sewers - 1st Street to Maple Avenue
Results
Rapid City, SD 57701

Elkton Utility Improvements - Phase II
Infrastructure
Bidding
Elkton, SD

CCTV Sewer Cleaning and Inspection Rosebud Sewer Collection System
Post-Bid
Rosebud, SD

Rushmore Area Reconstruction - Phase I
Results
$5,300,000 est. value
Brandon, SD

Last Updated 09/30/2021 12:50 PM
Project Title

Y--Replace Vault Toilets at Badlands National Park

Physical Address View project details and contacts
City, State (County) Interior, Wall, SD 57790 (Jackson, Pennington Counties)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Provide labor, materials, and equipment necessary to demolish three concrete vault toilets and all their components, including the sanitary waste vaults. Haul off old vault toilets to an approved landfill. Contractor will be responsible to remove and dispose of waste contained in existing vaults prior to demolition of each structure. Each structure is approximately 16’ by 6 ‘. During construction, the contractor will provide and maintain portable chemical toilets. Prepare sites for new precast concrete vaults and precast concrete vault toilet. Install new precast vaults and precast concrete vault toilets that are ADA compliant. Ensure that vault toilets are tied into the existing access areas around the vault toilets location, some modification may need to happen. Vault toilets need to meet Badlands National Park approved color palette for exterior finishes. Any ground disturbance will need to be monitored by a park provided paleontological monitor.

Details

Division 01 - General Requirements, Construction Facilities, Sanitary Facilities.
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents