Similar Projects
Facility New Construction, Additions and Renovations - 2020 Bond - Platteville Public Schools
Addition, New Construction, Infrastructure, Renovation
Conception
$36,000,000 CJ est. value
Platteville, WI 53818

Cuba City School District 2022 Bond - Elementary and High School
Addition, Demolition, Renovation, Infrastructure
Design
$36,000,000 CJ est. value
Cuba City, WI 53807

Dickeyville - Lancaster Const / Passing Lanes and Slopes / Misc
Infrastructure
Design
$7,000,000 CJ est. value
Lancaster, WI 53813

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Resurfacing Project on Rural Ridge Road South of CTH Q
Infrastructure
Post-Bid
$62,000 CJ est. value
Cuba City, WI 53807

Scot Substation Earthwork
Infrastructure
Results
Muscoda, WI

Larch Court Construction
Infrastructure
Results
$301,820 est. value
Lancaster, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Scenic Rivers Energy Cooperative Headquarters Building
New Construction, Infrastructure - 56,000 SF
Pending Verification
$7,000,000 CJ est. value
Lancaster, WI 53813

New Fire Station - City of Platteville
Demolition, New Construction, Infrastructure - 32,000 SF
Pending Verification
$16,000,000 CJ est. value
Platteville, WI 53818

Salt Shed
New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
Cuba City, WI 53807

2022 Utility Improvements USH 61/STH 35
Infrastructure
Results
Potosi, WI

Red Barn Wind Farm
Infrastructure
Construction
$162,000,000 CJ est. value
Wingville, WI 53569

STH 133, Cassville - Patch Grove, 400 ft S CTH VV to STH 35, Grant
Infrastructure
Pending Verification
$9,000,000 CJ est. value
Mount Hope, WI 53816

Last Updated 03/23/2023 07:38 AM
Project Title

2023 Business Highway 151 (Fastenal) Storm Sewer Construction

Physical Address View project details and contacts
City, State (County) Platteville, WI 53818   (Grant County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $7,639,690 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of installing new storm sewer along the north side of Business Highway 151 from the Rountree Branch to the east side of the Fastenal property. Bids shall be on a unit price basis, with additive alternate bid items as indicated in the Bid Form. Work of the Project includes installation of storm sewer and restoration. 1. Contract #4-23: Storm Sewer Construction a. Location: 1) North side of Business Highway 151 in front of Fastenal (480 E. Business Highway 151). b. Description of Work to be completed: 1) Traffic control. 2) Installation and maintenance of erosion control measures. 3) Clearing and grubbing. 4) Installation of storm sewer, inlets, manholes, and appurtenances. 5) Restoration of Fastenal Driveway. 6) Landscaping and restoration. 2. Alternate #4-23-A: Extend Storm Sewer to PCA Trail a. Location: 1) North side of Business Highway 151 from PCA Trail to Fastenal driveway (480 E. Business Highway 151). b. Description of Work to be completed: 1) Traffic control. 2) Installation and maintenance of erosion control measures. 3) Clearing and grubbing. 4) Installation of storm sewer, inlets, manholes, and appurtenances. 5) Landscaping and restoration. Est. Value: $ 50,000.00. All electronic bids will be downloaded and publicly read aloud during the public bid opening that will be held at the office of the City of Platteville at the address. QuestCDN Vbid system requires Bidders to purchase bidding documents from QuestCDN. Please contact QuestCDN at 952-233-1632 or info@questcdn.com for assistance in free membership registration, downloading, and working with the digital project information. Bidding documents will be made available to Prospective Bidders after Friday, March 10, 2023. Bidding Documents may also be examined at the office of the City of Platteville, at 75 N. Bonson Street, Platteville, Wisconsin 53818, on Mondays through Fridays between the hours of 8:00 a.m. and 4:30 p.m. CST. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Bid documents are not yet available for download. If the bid is accepted, the Bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the Bidder as soon as the contract is signed. If after 15 days the Bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. BIDDER is required to deliver the original certified check or bid bond within 72 hours of bid opening to Delta 3 Engineering, Inc., Attn: Dan Dreessens, 875 S. Chestnut Street, Platteville, Wisconsin 53818. Bids may not be withdrawn within 90 days after the date of the bid opening. The OWNER reserves the right to increase or decrease the quantity of any item or portion of the work, or to omit portions of the work, as may be deemed necessary by the OWNER, and the same shall in no way affect or make void the contract, except those additions to, or deductions from, the contract price will be appropriately made. The OWNER reserves the right to waive any informalities, or to reject any or all bids, or any part of a bid, and to award the Contract to the Bidder, who in the judgment of the OWNER, will best serve the interest of the OWNER.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents