Last Updated | 02/14/2024 09:35 AM |
Project Title | 205th Avenue Reconstruction Project and Martin Lake Storm Sewer Project |
Physical Address | View project details and contacts |
City, State (County) | East Bethel, MN 55092 (Chisago County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $492,589 [brand] Estimate |
Plans Available from | Civil Engineer - 02/14/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bids for the construction of the 205th Avenue Reconstruction Project and the Martin Lake Storm Sewer Project Description: CLEARING AND GRUBBING 0.9 ACRE EXCAVATION - MUCK (EV) 3188 CU YD EXCAVATION - SUBGRADE (EV) 377 CU YD SELECT GRANULAR EMBANKMENT (LV) 3052 CU YD AGGREGATE BASE CLASS 5 408 TON TYPE SP 9.5 WEARING COURSE MIXTURE (2;B) 3.0" THICK 30 SQ YD TYPE SP 9.5 WEARING COURSE MIXTURE (2;B) 820 TON TYPE SP 12.5 NON WEARING COURSE MIXTURE (2;B) 907 TON 15" RC PIPE APRON 3 EACH 15" RC PIPE CULVERT 450 LIN FT SIGN PANELS TYPE C 16 SQ FT SILT FENCE; TYPE MS 2393 LIN FT RESTORATION 1.3 ACRE Project Category Code: Paving (Highway, Road or Street), Street/Roadway Reconstruction , Pavement Removal, Culverts, Waterways, Stormwater Channels, Erosion Control - Temporary, Street/Road Pavement Marking, Paving (Asphalt or Concrete), Stormwater Improvements |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |