Similar Projects
Construction of NAWS South Prairie Reservoir and Control Structure-General Construction
New Construction
Results
$14,600,000 est. value
Bismarck, ND

Pipestem Dam Spillway Modifications
Renovation, Term Contract
Post-Bid
$100,000,000 to $250,000,000 est. value
Jamestown, ND 58401

Drayton Dam Fish Passage Mitigation
Term Contract
Bidding
$5,000,000 to $10,000,000 est. value
Drayton, ND

P--Bone Hill NWR - Dam Breach Construction
Renovation
Results
ND

Baldhill Dam Ogee Spillway Concrete Repair Project
Renovation
Post-Bid
$500,000 to $1,000,000 est. value
Valley City, ND 58072

Construction of NAWS South Prairie Reservoir and Control Structure - 10.5 MG Wire-Wound Reservoir Construction
New Construction
Results
$14,600,000 est. value
Bismarck, ND

McDowell Dam Bank Stabilization 2021
Results
$106,000 est. value
Bismarck, ND

Construction of NAWS South Prairie Reservoir and Control Structure - Combined General, Mechanical, Electrical and Reservoir Construction
New Construction
Results
$14,600,000 est. value
Bismarck, ND

Red River Structure - FMM Area Flood Risk Management
Post-Bid
$100,000,000 to $250,000,000 est. value
Fargo, ND

Construction of NAWS South Prairie Reservoir and Control Structure - Combined General, Mechanical and Electrical Construction
New Construction
Results
$14,600,000 est. value
Bismarck, ND

Jamestown Dam Outlet Works Stilling Basin Concrete Floor Repairs
Results
$500,000 to $1,000,000 est. value
Jamestown, ND

Last Updated 03/29/2022 02:33 AM
Project Title

Underground Tunnel 2022 Albrecht Boulevard - Phase 3

Physical Address View project details and contacts
City, State (County) Fargo, ND 58125   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,305,000 to $1,415,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Estimated Value: Base Bid: $1,305,000. Alternate A: $90,000. Alternate B: $20,000. The project consists of sanitary sewer mains, storm sewer, concrete streets with curb & gutter, sidewalks, and concrete steam tunnel improvement

Details

Dam/Tunnel, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents