Similar Projects
Plaza at Pinnacle Hills NW
New Construction, Infrastructure - 15,360 SF
Conception
$3,300,000 est. value
Rogers, AR 72758

8th Street Commercial Buildings
New Construction, Infrastructure
Conception
$5,800,000 CJ est. value
Rogers, AR 72758

Fox Meadow Subdivision
New Construction, Infrastructure - 35,000 SF
Design
$3,900,000 CJ est. value
Siloam Springs, AR 72761

Fox Meadow Subdivision
New Construction, Infrastructure - 35,000 SF
Design
$3,900,000 CJ est. value
Siloam Springs, AR 72761

Tapestry Collection by Hilton / Rogers
New Construction, Infrastructure - 56,300 SF
Bidding
$34,000,000 CJ est. value
Rogers, AR 72758

Tapestry Collection by Hilton / Rogers
New Construction, Infrastructure - 56,300 SF
Bidding
$34,000,000 CJ est. value
Rogers, AR 72758

Bentonville Public Library Expansion
Addition, Demolition, Renovation, Infrastructure - 59,009 SF
Sub-Bidding
$12,000,000 CJ est. value
Bentonville, AR 72712

Construction of 8th Street Widening SW I-Street to SE J-Street
Infrastructure
Post-Bid
Bentonville, AR

8th Street Widening - SW I-Street to SE J-Street
Infrastructure
Post-Bid
Bentonville, AR

2021 Street Overlay
Infrastructure
Results
Bentonville, AR

2021 Mastic Sealer for City of Bentonville Streets
Infrastructure
Results
Bentonville, AR

McReynolds Recreational Vehicle Park
New Construction
Construction
Siloam Springs, AR 72761

SW 4th and B Street Townhomes
New Construction, Infrastructure - 10,451 SF
Construction
$2,000,000 CJ est. value
Bentonville, AR 72712

Morning Star Subdivision
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Bentonville, AR 72712

Jiffy Trip #721 / Rogers
New Construction, Infrastructure
Pending Verification
$1,430,000 CJ est. value
Rogers, AR 72756

Last Updated 01/23/2023 05:10 AM
Project Title

Garfield Overlay and Surfacing (S)

Physical Address View project details and contacts
City, State (County) Gentry, AR 72734   (Benton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $571,651 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Purpose of This Project Is to Overlay and Surface Approximately 2.25 Miles of Various Streets in the City of Garfield in Benton County. This Project Consists of Aggregate Base Course, Achm Surface Course, Cold Milling Asphalt Pavement, Achm Patching of Existing Roadway, Maintenance of Traffic, and Misc. Items. Routes: Various County: Benton Length: 2.25 Miles in Length. Questions pertaining to projects during the advertisement period should be addressed to the Program Management Division at pmd@ardot.gov. The deadline to submit a question is the Wednesday prior to the scheduled letting date. A question submitted after the close of business on the Wednesday prior to the scheduled letting date may not receive a response. In order to have a bid considered, contractors must furnish a proposal guaranty consisting of either a bidder's bond or a certified or cashier's check in the amount of five percent (5%) of the total amount bid. In order for a bond to be acceptable to the Department, the company issuing the bond must be named in the Department of Treasury Listing of companies holding Certificates of Authority as acceptable sureties on Federal Bonds and as acceptable reinsuring companies. The Underwriting Limitation of the bonding company shall be adhered to. Any excess (between the face amount of the Bond and the Underwriting Limitation) shall be protected by reinsurance provided by an acceptable reinsuring company. These contracts are subject to normal prequalification, licensing and bonding requirements, applicable labor laws, non-discrimination provisions, wage rate laws and other Federal laws including the Fair Labor Standards Acts of 1938. The Work Hours Act of 1962 and Title VI of the Civil Rights Act of 1964 also apply. The Arkansas Department of Transportation complies with all civil rights provisions of federal statutes and related authorities that prohibited discrimination in programs and activities receiving federal financialassistance. Therefore, the Department does not discriminate on the basis of race, sex, color, age, national origin, religion, or disability, in the admission, access to and treatment in Department's programs and activities, as well as the Department's hiring or employment practices. Complaints of alleged discrimination and inquiries regarding the Department's nondiscrimination policies may be directed to Joanna P. McFadden, Section Head - EEO/DBE (ADA/504/Title VI Coordinator), P. O. Box 2261, Little Rock, AR 72203, (501) 569-2298, (Voice/TTY 711), or the following email address: joanna.mcfadden@ardot.gov. The Department reserves the right to reject any or all bids and to waive any formalities. AR DOT - Garfield Overlay and Surfacing (S)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents