Similar Projects
Reported | 03/04/2021 12:00 AM |
Project Title | 6-Month Tied-Concrete Block Erosion Control Material |
Physical Address | View project details and contacts |
City, State (County) | AL (Mobile County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Aggregates |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This specification covers the technical requirements for the Manufacturing and Quality Assurance of the Tied-Concrete Block Erosion Control System. All materials shall meet or exceed the requirements of this specification. Tied-Concrete Block Erosion Control Mat shall be approved by Alabama Department of Transportation's Product Evaluation Board for use as a permanent ditch lining material. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |