Similar Projects
Wastewater Plant Disinfection Improvements
Bidding
Mount Morris, NY

Interior Gas Piping Upgrades at the Enrico Fermi School
Bidding
Yonkers, NY 10701

Diesel Storage Tanks and Accessories
Term Contract
Post-Bid
Gilboa, NY 12076

Gas Line Installation at Ulster County Law Enforcement Center
Term Contract
Post-Bid
Kingston, NY 12402

Gas Line Replacement at New Rochelle Train Station
Results
New Rochelle, NY 10801

Roosevelt High School Gas Utility Upgrade Project
Results
Less than $450,000 est. value
Yonkers, NY 10710

Kenmore Mercy Hospital - Fuel Tank-Generator Replacement
Construction
Kenmore, NY 14217

Underground Gasoline Tank Removal and Associated Site Work
Bidding
Carmel, NY 10512

Maintenance and Repair of Equipment and all Appurtenances of Petroleum Bulk Storage Tanks, including Submersible Pumps of Oil-Water Separators (KS)
Term Contract
Post-Bid
Yonkers, NY 10701

Interlaken Concrete Pad and Propane Tank Relocation
Results
Less than $50,000 est. value
Interlaken, NY 14847

Replacement of Natural Gas Piping at Carpenter Avenue Apartments
Post-Bid
Mount Kisco, NY 10549

Reactor Tank Cleaning
Results
Buffalo, NY 14202

Construction of a Shared-Use Fuel Facility
Post-Bid
Ithaca, NY 14850

Remove/Replace Fuel Oil Tanks at Fishkill CF
Term Contract
Results
$2,500,000 to $5,000,000 est. value
Beacon, NY 12508

Tank Tightness Testing
Term Contract
Post-Bid
Mayville, NY 14757

Reported 04/02/2021 12:00 AM
Project Title

API 653 - Out of Service Tank Inspection - Stewart Lap, Ny.

Physical Address View project details and contacts
City, State (County) New Windsor, NY   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and transfer approximately 5,000 Gallons of fuel product and dispose of approximately 350 gallons of fuel/sludge. Contractor will be responsible for coordinating with the installation as to how the fuel will be transferred and stored during the services of Cleaning and Inspecting

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents