Sludge Dewatering and Drying Facilities
New Construction
Bidding
Concord, Griffin, GA 30223

Sludge Dewatering and Drying Facilities
New Construction
Bidding
Concord, Griffin, GA 30223

FY 2019 Southeast WWTP Improvements Phase II
Post-Bid
Douglas, GA 31533

Baconton Wastewater Treatment Plant Improvements
Post-Bid
Less than $175,000 est. value
Baconton, GA 31716

UV Disinfection System Replacement
Results
Less than $164,927 est. value
Statesboro, GA 30458

North WPCP Improvements
Results
Hawkinsville, GA

Middle Oconee WRF Maintenance Building
New Construction
Construction
Less than $1,345,000 est. value
Athens, GA 30606

Biosolids System Improvements - Digester Covers
Post-Bid
Augusta, GA 30901

James Creek Building Repairs
Results
Less than $63,030 est. value
Suwanee, GA 30024

Mill Creek Water Pollution Control Plant
Post-Bid
Chatsworth, GA 30705

Bar Screen and Grit Removal Equipment Replacement
Results
Fitzgerald, GA

Bioxide Odor and Corrosion Control
Term Contract
Post-Bid
Savannah, GA 31400

Operation and Maintenance Services for Wastewater Facilities and Pump Stations in the North Fulton Service Area
Results
Atlanta, GA

Membrane Replacement on Anaerobic Digester Covers Water Pollution Control Plant
Post-Bid
Milledgeville, GA

Rubes Creek Water Reclamation Facility Dewatering Building Modifications Project
Renovation
Results
Woodstock, GA

Reported 01/16/2021 12:00 AM
Project Title

USDA Sewer System Improvements

Physical Address View project details and contacts
City, State (County) Thomaston, GA   (Upson County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work and will be awarded in two separate contracts: Contract A – WPCP Upgrades - Town Branch WPCP Improvements will include (but is not limited to) the addition of a splitter box and new clarifier along with upgraded return activated sludge (RAS) pumps. Miscellaneous piping improvements will be required and a portable belt press and support slab will be provided. Bell Creek Improvements will include electrical upgrades to move motor control centers out of the basement where frequent flooding occurs. Miscellaneous piping improvements will be required and a concrete pad will be poured to support a portable belt press. One mobile trailer mounted belt press will be purchased as part of this contract and will serve Bell Creek WPCP and Town Branch WPCP Contract B- Town Branch Inceptor - The project consists of (but is not limited to) approximately 12,000 LF of 30” gravity sewer main construction across primarily cross-country terrain. The proposed construction will include the removal of an existing 18” gravity sewer main, installation of new 30” gravity sewer, installation of associated manholes, pavement replacement at road-crossings, erosion and sediment control devices and measures, and other associated work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 11 - Equipment.
Division 14 - Conveying Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents