Similar Projects
Finish Site Plan Work for New Marina Office
New Construction, Infrastructure
Conception
$116,643 CJ est. value
Islamorada, FL 33036

Finish Site Plan Work for New Marina Office
New Construction, Infrastructure
Conception
$116,643 CJ est. value
Islamorada, FL 33036

Lower Keys Scattered Sites
New Construction, Infrastructure
Design
Big Pine Key, Summerland Key, FL 33043

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Rebid Sands SLR Roadway and Drainage Pilot Project
Infrastructure
Bidding
$22,419,304 CJ est. value
Big Pine Key, FL 33043

Key Haven Wastewater Forcemain Improvements Phase 2 Rebid
Infrastructure
Bidding
$400,000 CJ est. value
Key West Naval Air Station, FL 33040

Monroe County Emergency Operations Center
New Construction - 23,000 SF
Post-Bid
Less than $22,000,000 est. value
Marathon, FL 33050

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Y--Design-Build/Design-Bid-Build Indefinite Delivery/Indefinite Quantity Firm Fixed Price Multiple Award Construction Contract, NAVFAC SE Area of Operations
Results
$20,000,000 to $900,000,000 est. value

D/B Southeast MATOC - Phase 2
Results
$1,000,000 to $170,000,000 est. value

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Sea Breeze Mobile Home and RV Park
New Construction, Build-Out - 25,974 SF
Construction
$1,000,000 est. value
Islamorada, FL 33036

Sombrero Beach Sand Renourishment - City of Marathon
Infrastructure
Conception
$416,000 CJ est. value
Marathon, FL 33050

Generator Building - Monroe County Sheriffs Office
New Construction, Infrastructure - 5,161 SF
Design
$1,000,000 CJ est. value
Key West Nas, FL 33040

Resurfacing/Drainage Improvements/Steel Sheet Piling
Infrastructure
Bidding
$16,902,664 CJ est. value
Layton, FL 33001

Last Updated 02/20/2023 10:10 AM
Project Title

Transmission Line Insulator Assembly Replacement for 138KV Line

Physical Address View project details and contacts
City, State (County) Key West Nas, FL 33040   (Monroe County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,734,817 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work involves the replacement of post insulators on Line 4 (138 kV) beginning at US1 Substation, Stock Island, Florida to Big Coppitt Substation, Big Coppitt, Florida. Line-4 consists of square precast concrete and round precast concrete. Horizontal Post Insulators, Hardware, Static Hardware and Grounding connection to static are to be replaced on these structures. Furthermore, Vibration Dampeners are to be replaced at all locations. Post Insulators will be polymer type. Transmission line-4 can be de-energized during the Hurricane off-season, November thru April. Plans should be in place and prepared to re-energize in the event of load emergency. Refer to Appendix A for a list of structures, and their associated unit (assembly) replacements, included under the scope of this project. Refer to Appendix B for all reference drawings, existing plan, and project location. Location of Work The following is a description of the line segments included under the scope of this project: Line Segment 4 - Work begins at Structure #1 and ends at Structure #100. Structure locations are both on land and in open water. Structure types consist of square and round precast concrete monopole structures. Bid Bond Amount 5% Performance Bond Required Yes Insurance Required Yes Bid Bond Required Yes Question End Date 11/18/2022 12:00 PM Anticipated Award Date 1/11/2023

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents