Similar Projects
Last Updated | 01/09/2023 09:37 AM |
Project Title | Blackinton Infrastructure Improvements |
Physical Address | View project details and contacts |
City, State (County) | North Adams, MA 01247 (Berkshire County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,173,100 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of December 15, 2022, this project has not yet been awarded. A timeline for award has not yet been established. Project consists of replacing an inlet control structure & replacing about 60 LF of 36-inch drainpipe with a 60" x 78" RCP pipe, construct concrete block retaining wall drainage outlet structure, sewer segment replacement & repaving. Being funded by an FY'20 MassWorks Grant to the City through the State Dept. of Hsg. & Economic Development. Technical questions to Jacab Murray, Sr. PE, of the Waterfield Design Group, 50 Cross St; Winchester, MA, 781-756-0001 (x-24). All requests for interpretations shall be in writing and emailed (jmurray@wdgrp.com) to Jacob Murray, Waterfield Design Group (WDG) |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |