Similar Projects
Draffenville West Sewer Expansion
Infrastructure
Design
$70,500 est. value
Benton, KY

SSES and Sewer Rehabilitation Project
New Construction, Infrastructure
Bidding
$400,000 est. value
Stanton, KY

Collection Systems Rehabilitation CIPP Lining
Infrastructure
Bidding
Kenton, KY

East 18" Interceptor Sewer
Post-Bid
Less than $1,397,000 est. value
Mount Washington, KY 40047

WWTP & Sanitary Sewer Project - Force Main & Pipe Rehab - Contract 2
Post-Bid
Tompkinsville, KY

Daviess County Middle School Site Utility Infrastructure
Results
Owensboro, KY 42303

Wolf Run Trunks D & E Wastewater System Improvements
Results
Lexington, KY

Water and Sewer Infrastructure
Infrastructure
Pending Verification
$2,336,513 est. value
Pikeville, KY

Job Corps EDA Sanitary Sewer Replacement, Contract 1-2022
Infrastructure
Bidding
$420,000 est. value
Morganfield, KY

WWTP and Sanitary Sewer - SBR WWTP Contract 1
Post-Bid
Tompkinsville, KY

Montpellier Drive Water and Sewer Rehabilitation
Results
Fort Knox, KY 40121

Transpark II Water Sewer Phase 1
Post-Bid
KY

Sewer Rehabilitation - Contract 2
Results
Beattyville, KY

Wilkinson and Olive Street Sanitary Sewer Replacement
Post-Bid
Frankfort, KY 40601

MFWQTC Sewer and Manhole Rehabilitation
Results
$100,000 to $500,000 est. value
Louisville, KY 40211

Last Updated 06/24/2022 12:22 AM
Project Title

LaGrange North Interceptor Sanitary Phase II

Physical Address View project details and contacts
City, State (County) La Grange, KY   (Oldham County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

- CCTV approximately 3,223 LF of existing gravity sanitary line. - Install thirteen (13) x 6' diameter precast sanitary manholes. - Install approximately 2,381 LF 24" SDR26 PVC gravity sanitary line - Install approximately 16 LF 8" SDR26 PVC gravity sanitary line. - Install approximately 5 LF 10" SDR26 PVC gravity sanitary line. - Epoxy line four (4) existing 6' diameter manholes. - Five (5) connections of proposed line to existing manholes. - Two (2) connections of existing lines to proposed manholes. - Bypass pumping as required for construction. North Interceptor has peak flow of 1,600 GPM. - Time allowed for completion of the Project is 100 consecutive calendar days.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents