Similar Projects
WTP Chemical Feed Building Addition and Lift Station Improvements
Addition
Bidding
Loogootee, IN

Monroeville Wastewater Improvements
Renovation
Bidding
Monroeville, IN

Rivoli Theater Stabilization
Renovation
Post-Bid
Indianapolis, IN 46201

WWTP Improvements Phase 2A - Sludge Processing Improvements and Phase 2B - New Sludge Processing Building
Post-Bid
Bristol, IN

North Plant Clarifier No. 2 Repair
Results
Less than $164,000 est. value
Evansville, IN 47708

WWTP Digester Cleaning
Results
Mishawaka, IN 46544

WWTP Rehabilitation and Expansion
Post-Bid
Sellersburg, IN

WWTP Final Clarifier Nos. 4-5, Aeration Tank Nos. 1-4 and Disinfection
Results
South Bend, IN 46628

Wastewater Utility Rehabilitation
Post-Bid
Ladoga, IN 47954

WPCP Odor Control Improvements
Results
Fort Wayne, IN 46802

Peak Excess Flow Treatment Facility
Post-Bid
Kokomo, IN

Wastewater Utilities Improvements
Results
Chesterfield, IN 46017

West WWTP Renewable Natural Gas (RNG) System
Post-Bid
Evansville, IN

Fox Island Commercial On-Site Wastewater Facility
Results
Less than $300,000 est. value
Fort Wayne, IN 46809

Phosphorus Removal Chemical Building
Addition
Post-Bid
Linton, IN

Reported 07/21/2021 12:00 AM
Project Title

Waste Water Treatment Plant Capacity Upgrades – Phase 2

Physical Address View project details and contacts
City, State (County) Elkhart, IN   (Elkhart County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Work generally consists of constructing the following: 1. New cloth media disk filtration facility, associated flow control diversion structure, and influent/effluent54” piping. 2. Rehabilitation of six existing primary clarifiers and new flow diversion control and metering structure for one primary clarifier. 3. Four new primary sludge pump systems and six actuated sludge withdrawal valves. 4. Four new return activated sludge pump systems, eight RAS telescoping valves,and five RAS flow control valves. 5. Three new primary effluent flow control valve and flow metering systems. 6. Three new high speed turbo blower systems, three new air headers at aeration tanks,and new air diffusers in five existing, 5-pass, aeration tanks.7. Various new channel slide gates with actuators. 8. New ferric chloride chemical storage and feed facilities. 9. New 2-story Operations Building with offices, locker facilities, and control room. 10. General construction of waste water treatment facilities including sitework, yard piping, structural, architectural, process piping and equipment, plumbing, heating, ventilation, air conditioning, electrical,and instrumentation and control.

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents