Similar Projects
Arch Street Downtown Complete Streets Improvements - City of New Britian
Infrastructure
Conception
New Britain, CT

Relocation of Pan Am At-Grade Crossing - City of New Britain
Infrastructure
Conception
$398,000 est. value
New Britain, CT

Cheshire Community Ymca
Alteration
Design
Southington, CT 06489

The Beeline Trail Phase 2 (West Main Street To Corbin Avenue) - City of New Britain
Alteration
Design
$600,000 est. value
New Britain, CT

RFQ Construction Manager at Risk - Reconstruction State Police Firing Range
Demolition, New Construction, Infrastructure
Bidding
$8,543,014 CJ est. value
Simsbury, CT 06089

Police Department Fuel Station Improvements
Infrastructure
Bidding
$290,000 CJ est. value
Glastonbury, CT 06033

Site Upgrades at Elms Village, The Highlands, Rochambeau Apartments
Post-Bid
Hartford, CT 06108

Rental of Bridge Repair Units
Post-Bid
Hartford, CT

2021 Reclamation
Results
West Hartford, CT

CY2021 Paving of Roadways
Results
Windsor, CT

Enfield Street School and Henry Barnard School Parking Lot Improvements
Infrastructure
Construction
$570,180 CJ est. value
Enfield, CT 06082

Enfield Street School and Henry Barnard School Parking Lot Improvements
Infrastructure
Construction
$570,180 CJ est. value
Enfield, CT 06082

New Pool and Bathhouse - Eisenhower Park
New Construction, Infrastructure
Pending Verification
$2,500,000 CJ est. value
West Hartford, CT 06117

PeoplesBank / South Windsor
New Construction, Infrastructure - 2,000 SF
Pending Verification
$500,000 CJ est. value
South Windsor, CT 06074

Stanley Quarter Park Phase II Pave Roadways and Phase III Pave Parking Lots and Install Lighting - City of New Britain
Renovation, Infrastructure
Conception
$1,400,000 est. value
New Britain, CT 06053

Last Updated 08/02/2022 11:41 PM
Project Title

Replacement Of Bridge No. 04506 South River Street Over Freshwater Brook

Physical Address View project details and contacts
City, State (County) Enfield, CT 06082   (Hartford County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $2,669,151 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 2, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Replacement of South River Street Bridge No. 04506 Street Contract Goal: 10% Disadvantaged Business Enterprises (DBEs) The Town of Enfield (Municipality) hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, Disadvantaged Business Enterprises will be afforded full opportunity to submit bids in response to this invitation and that they will not be discriminated against on the grounds of race, color, national origin, sex, sexual orientation, mental retardation or physical disability, including but not limited to blindness, in consideration for an award. A Surety Company Bond, on the form furnished by the Municipality, for at least 30 percent of the amount of the bid must accompany each proposal. A certified check will not be accepted. Prospective bidders must have a current sworn Statement (CON-16) on file with the Connecticut Department of Transportation and be prequalified to perform Group No. 8 (Minor Bridges) work. The Bidder's Prequalification approval letter signed by the CTDOT Contracts Manager shall be included as part of the bid package submitted to the Municipality. Any Contractor or Subcontractor engaged in surface preparation and/or coating application must be certified by the Steel Structures Painting Council. The two (2) lowest bidders, as determined by the Municipality immediately after the bid opening, shall submit the Pre-award DBE Commitment Approval Request form(s) to the Municipality NO LATER THAN FIVE (5) calendar days after the bid opening. This is a requirement of Title 49, Code of Federal Regulations (CFR) Part 26, Participation of DBEs. CONTRACTORS that find discrepancies and/or errors in or between plans, specifications, quantities and other matters must immediately notify John Cabibbo, Assistant Town Engineer, Enfield Town Hall, 820 Enfield Street, Enfield, CT 06082, jcabibbo@enfield.org, in writing not less than ten business (10) days before the scheduled bid opening. The Municipality reserves the right to reject any and all bids.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents