Similar Projects
Airfield Rehabilitation Program - Runway 2-20 - City of New Orleans
Infrastructure
Conception
$32,000,000 CJ est. value
New Orleans, LA 70130

Airfield Rehabilitation Program - Runway 11-29 - City of New Orleans
Infrastructure
Conception
$42,000,000 CJ est. value
New Orleans, LA 70130

3401 Saint Charles Avenue Mixed-Use Development
New Construction, Infrastructure - 19,000 SF
Design
$30,000,000 CJ est. value
New Orleans, LA 70115

Harold Gene Devore Playground
Infrastructure
Design
$230,000 CJ est. value
New Orleans, LA 70114

Gernon Brown Recreation Center New Play Structure
New Construction, Infrastructure
Bidding
$400,000 CJ est. value
New Orleans, LA 70124

Easton Playground Repairs - Concessions, Half Basketball Court and Fencing
Infrastructure
Bidding
$309,226 CJ est. value
New Orleans, LA 70119

Alta Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$696,942 CJ est. value
Bell City, LA 70630

Replacement of Two (2) Sections of Underground Sewer Lines
Infrastructure
Post-Bid
$200,000 CJ est. value
New Orleans, LA 70112

George Washington Carver Park Improvements - Zone B (Re-Bid)
Infrastructure
Results
$537,000 CJ est. value
New Orleans, LA 70118

Oak Park Drainage Improvements (Re-Bid)
Infrastructure
Results
$3,312,439 CJ est. value
New Orleans, LA 70112

2230 Magazine Mixed-Use
New Construction, Infrastructure - 15,000 SF
Pending Verification
$4,000,000 CJ est. value
New Orleans, LA 70130

Navy Office Complex Redevelopment - Phase 1
New Construction, Infrastructure - 40,000 SF
Pending Verification
$120,000,000 CJ est. value
New Orleans, LA 70117

DC Blox Data Center / New Orleans
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
New Orleans, LA 70112

Mixed-Use District Around Ernest N. Morial Convention Center / New Orleans
New Construction, Infrastructure
Design
$557,000,000 CJ est. value
New Orleans, LA 70130

Treasure Street Development Versailles Subdivision
Infrastructure
Bidding
$650,000 CJ est. value
New Orleans, LA 70122

Last Updated 06/21/2023 10:23 AM
Project Title

Caesars Superdome Renovation - Phase 4 & 5

Physical Address View project details and contacts
City, State (County) New Orleans, LA 70112   (Orleans County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Site Development, Stadium
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The $450 million Caesars Superdome Renovation consists of 1,935,125 square feet of renovations for the New Orleans Saints stadium. A scope breakdown on Phase 4 and 5 has not been released. As of January 12, 2023, construction is underway and commenced June 2022 __________________________________________________________________________________________________________________________________________________________ The Saints have unveiled the latest updates to the Envision the Future transformation of the Caesars Superdome. It's part of a five-year project that is expected to be completed in 2024. The goal is to transform the fan experience and functionality, and those attending Saints games this season will be the first to experience this evolution. SUPERDOME RENOVATIONS - WHAT YOU NEED TO KNOW Work in the Superdome started on Monday, Jan 9, 2023 just hours after the Saints season ended, with the west exterior concourse being layered with door frames. Those “frames” were the drywall brackets that served as anchors for the temporary walls that framed the concourses throughout the 2022 season, which allowed work for Envision the Future to continue. The temporary walls quickly came down in multiple areas and new steel beams began flowing into Caesars Superdome. The latest phase “began” primarily on the east sideline, with demolition work commencing on the 100-plaza level all the way to the 650 levels. 40,000 square feet of ramps had been removed on the east side Gate C, and so, this year the build back is creating a new experience for fans on the east sideline. At the same time this offseason, workers have been removing 40,000 square feet of ramps on the west side to open the space needed for the same amenities created on the east sideline. The 100 Plaza on the East side has been widened and new fan facing amenities have been added. The Caesars Legends Sideline Club now begins on the 200 Level East side. The concourse on the 200 east sideline loges has been updated and the east 200 level concourse is also considered to be inside the sideline Legends club. There are tunnels or hallways at each end of the concourse allowing patrons to flow freely between concessions and restrooms on the concourse and field side back to the sideline club that sits along the building’s exterior wall. The Caesars Legends Sideline Club will provide guests with a much wider footprint to enjoy, a common theme that will be touched on throughout this series. The East Sideline 300 level suites were also gutted during this phase, with the redesigned space taking full advantage of the added space by housing newer and much longer suite accommodations (think of it as a modern adaptation on a New Orleans shotgun Caesars Superdome style!). The 300 level suites on the East side have practically doubled in length, with the same exact thing happening to the West sideline suites in 2024. Without the ramps on the east side, there is also much more room on the 300 level for new restrooms and pantries for hot and cold food preparation. Meanwhile, after taking down the temporary walls at Gate C, elevator shafts were created and many will be ready to whisk guests directly to and from the club and suite levels in rapid fashion, beginning with this season. With the temporary walls gone on the 400-suite level, the new escalators and atriums in the corners have come into full view. The new atriums (which will serve as an entire segment unto itself in the coming days), will maximize on quite a bit of previously unused space. The new, finished looks of the atriums on the corners of the Caesars Superdome are brighter and project the feeling of spaciousness. In the upper corners of Caesars Superdome, work is nearing completion on the standing room only decks or “SROs,” on the 650 levels in the northeast and northwest corners. The new standing room only decks, in each quad and the new escalators from the 500 level to the 650 levels are set to be ready for the upcoming season. The end zone valley on 450 level at Gate A is also getting a complete makeover with steps replacing the ramps along with new concessions and restrooms. Thus, the East side will have the new amenities in place this season (August completion). The ramps on the west side will be gone by the start of this season, and the temporary walls will be in the place there allowing work to continue the west sideline during the season when feasible. The west sideline is not without some new items to celebrated 2023 as the northwest atrium at Gate H will be complete and ready for the upcoming football season. In addition, the southeast quad at Gate D is getting the same renovation and atriums now constructed in the northeast and northwest quads. Tom Benson’s corner, a replica of the office of the late Saints Owner Tom Benson, with all of its artifacts safely stored has been removed. The 200-level Iberville Club above it also gone, and the Stadium Club on the 300 level has also been removed to make room for the third atrium in the southeast quad to be ready for the 2024 season.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents