Similar Projects
Parking Lot Improvements at the District 6 Sign Shop Located at 701 North MacArthur Boulevard
Infrastructure
Results
Springfield, IL 62702

FY2023 Bituminous Improvements
Infrastructure
Post-Bid
Springfield, IL

Upgrade Parking Lot/Site Lighting
Infrastructure, Alteration
Results
Less than $800,000 est. value
Springfield, IL 62703

Removal and Replacement of a Portion of the Existing Parking
Infrastructure
Results
Springfield, IL

Resurface POV Parking Lot Around Building 2
Infrastructure
Post-Bid
Less than $1,500,000 est. value
Springfield, IL 62702

Underground Parking Ramp Coating
Infrastructure
Post-Bid
Springfield, IL

FY2023 Concrete Patching
Term Contract, Infrastructure, Alteration
Post-Bid
Springfield, IL

4.8 Miles of Overlay and ADA Improvements on IL 125 From 0.1 Miles West of the Sangamon County Line to Richland Creek, East of Pleasant Plains
Infrastructure
Results
$2,000,000 est. value

Chatham Road Overlay - Lelend Grove
Infrastructure
Post-Bid
Springfield, IL

FY2022 Sidewalk Program
Results
Springfield, IL

Repair/Resurface Roadways and Sidewalks
Infrastructure
Results
Less than $3,000,000 est. value
Springfield, IL 62702

CWLP Traffic and Metering Lot Replacement
Term Contract, Infrastructure
Results
Springfield, IL 62703

North Park Renovations and Splash Pad
Renovation
Results
New Berlin, IL

Repair/Resurface Roadways and Sidewalks
Results
Less than $2,500,000 est. value
Springfield, IL

Parking Consolidation Zone 2
Infrastructure
Post-Bid
Springfield, IL

Last Updated 05/10/2022 04:22 PM
Project Title

FY 2023 Sidewalk Program

Physical Address View project details and contacts
City, State (County) Springfield, IL   (Sangamon County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DESCRIPTION OF WORK This improvement shall consist of the removal and replacement of sidewalk and incidental items at selected locations throughout the city. The general locations are listed in the attached schedule. Included in the work incidental to the basic construction, will be backfill, seeding, thickening along curb lines and possible asphalt or rock ramping at grade changes of new sidewalk to existing sidewalk. Note: The Contractor shall be responsible for having all utilities located.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents