Similar Projects
Hilo Wastewater Treatment Plant (WWTP) Rehabilitation and Replacement Project - Phase 1
Renovation
Results
$177,000,000 CJ est. value
Hilo, HI 96720

Fender Repairs at Pier 3, Hilo Harbor, Hawaii
Infrastructure
Bidding
$850,000 CJ est. value
Hilo, HI 96720

Electrical and Plumbing Installation
Alteration
Post-Bid
Kaneohe, HI 96744

Dole Middle School - Covered Learning Center
New Construction, Infrastructure
Results
$3,749,632 CJ est. value
Honolulu, HI 96819

Kaneohe Dam Flood Control Improvements
Infrastructure
Post-Bid
$400,000 CJ est. value
Honolulu, HI 96813

Wailuku Waterline Replacement (Lunalilo Street, Liholiho Street, Kamamalu Place, Kalama Place, and Leileihoku Street)
Infrastructure
Results
$4,025,000 CJ est. value
Wailuku, HI 96793

Last Updated 06/01/2023 09:32 PM
Project Title

Temporary Pumping Connections - Halawa 550 Reservoir

Physical Address View project details and contacts
City, State (County) Aiea, HI 96701   (Honolulu County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Requisition Number: R2023000052 Document Number: D2023000068 Start of Service Date: 09/13/2023 End of Service Date: 09/11/2024 Contract Duration: 365 Calendar Days Installation of new temporary pumping connection and all appurtenant work (Estimated Construction Cost: $10,000 TO $500,000) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A. This project consists of furnishing and paying for all labor, tools, materials, and equipment necessary to complete all electrical, mechanical, structural, and civil work at Halawa 550' Reservoir and Aiea Gulch in accordance with the plans and specifications, in place complete and ready for operation. This project consists of constructing a new temporary pumping connection. B. The scope of work identified in this section is the minimum required experience as it pertains to the contractor questionnaire in the Bid Solicitation. a. Construction of a potable water facility (pumping station or reservoir), including below grade and above grade pipes, fittings, and valves. b. Installation of Programmable Logic Controller (PLC) based telemetry equipment at a potable water facility (pumping station or reservoir), including power and communication connections, and appurtenant work. CONSTRUCTION COST: The estimated construction cost is between $10,000 to $500,000 365 CONSECUTIVE CALENDAR DAYS

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents