Similar Projects
PBC Convention Center - Air Handler Unit Refurbishment/Replacement
Term Contract, Alteration
Bidding
West Palm Beach, FL 33401

AASF 1 Building 860 HVAC Ventilation Upgrade
Alteration
Bidding
$300,000 to $350,000 est. value
Jacksonville, FL 32221

Cafeteria HVAC Upgrades Waller Elementary School
Post-Bid
Less than $500,000 est. value
Youngstown, FL 32466

Bryant Building Chiller and Boiler Replacement
Post-Bid
Tallahassee, FL 32399

Construct HV Duct Bank, Trident MACA
Results
$1,000,000 to $5,000,000 est. value
Cape Canaveral, FL 32920

Bratt Elementary and Ernest Ward Middle Schools - HVAC Upgrades
Results
Century, FL 32535

HVAC Repairs and Services
Infrastructure
Bidding
FL

Calhoun County Historic Courthouse HVAC Repairs
Post-Bid
Blountstown, FL 32424

Events Center Trane 35 Ton RTU
Results
Less than $55,000 est. value
Lake Mary, FL

HVAC Services - Cooling Unit Upgrade and Heat Pump Replacement
Alteration
Bidding
Saint Petersburg, FL 33716

Fleet - Exhaust Fan Replacement
Term Contract
Post-Bid
Less than $125,000 est. value
West Palm Beach, FL 33411

Doctors Memorial Hospital Chiller
Results
Perry, FL 32347

Replacement of Computer Room HVAC Equipment at the MC Blanchard Building at 190 West Government Street
Post-Bid
Pensacola, FL 32502

New AC Replacement at Fire Station 19
Results
Miramar, FL 33023

N041--Air Curtains Removal and Install
Post-Bid
West Palm Beach, FL 33410

Reported 08/27/2021 12:00 AM
Project Title

65th SOS HVAC Expansion

Physical Address View project details and contacts
City, State (County) Hurlburt Field, FL   (Okaloosa County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide Heating, Ventilation, and Air Conditioning (HVAC) services to provide all necessary professional supervision, labor, travel, materials, tools, equipment, accessories, and other items necessary to complete the installation of all components safely. The installation will comply with the Air Force certification standards outlined in the following standardsand safety publications. - Telecommunications Industry Association (TIA) / Electronic Industries Alliance (EIA)- 607, Commercial Building Grounding and Bonding Requirements - National Fire Protection Association (NFPA) 70 National Electric Code (NEC) - NFPA 101, Life Safety Code - NFPA 780, Standard for the Installation of Lightning Protection Systems - Committee on National Security Systems (CNSSI) 7003, Protected Distribution Systems(PDS) The Contractor shall provide all of the necessary tools and equipment to complete the installation. This requirement includes any ladders, lifts, hoists, power tools, safety gear, or other equipment, tools, supplies necessary to complete installation and provide testing of all installed components. There are a total of five (5) mobile containers requiring two (2) HVAC systems and associated equipment and services. Details are located in section 1.2 Basic Services.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents