Similar Projects
Housing Replacement Program - 514 Southeast 13th Street
Renovation
Bidding
Gainesville, FL 32601

Housing Rehabilitation Program - 6521 Northwest 36th Terrace
Renovation
Bidding
Gainesville, FL 32653

Community Development Block Grant (CDBG) Housing Rehabilitation/Replacement Program
New Construction, Demolition
Post-Bid
FL

Pine Meadows Unit Reconstruction
Renovation
Post-Bid
Gainesville, FL 32641

New Home Builders for Heartwood Neighborhood
New Construction
Results
Gainesville, FL 32641

Delores Wilson House Construction
New Construction
Results
Gainesville, FL 32641

Design Build Services for 5915 Southwest 10th Lane
Construction
Gainesville, FL 32607

Oaks Preserve
New Construction
Pending Verification
Gainesville, FL

Housing Rehabilitation Program - 1604 Northeast 17th Place
Renovation
Bidding
Gainesville, FL 32609

Housing Rehabilitation Program - 3222 Southwest 27th Street
Renovation
Post-Bid
Gainesville, FL 32608

Oleta River State Park - PSS Residence Replacements
New Construction
Results

Housing Rehabilitation Program - 707 NW 7th Avenue
New Construction
Post-Bid
Gainesville, FL 32601

Moderate Rehabilitation Project
Results
Gainesville, FL

Housing Rehabilitation Program - 2909 NE 14th Drive
New Construction
Post-Bid
Gainesville, FL 32609

House Rehabilitation Program
Renovation
Results
Gainesville, FL 32641

Reported 02/05/2022 12:00 AM
Project Title

February Oak Park Unit Turns

Physical Address View project details and contacts
City, State (County) Gainesville, FL 32601   (Alachua County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work is to complete unit turns for six (6) public housing units. The units have varying scopes of work in addition to the general scope of a typical unit turn. The individual scopes of work are listed as individual attachments. The general scope of work for unit turns is as follows: • Prepare walls for painting to include patching/repairing holes. • Painting walls and ceiling throughout. • Paint underneath kitchen cabinets at GHA discretion. • Floors are to be stripped of existing wax, cleaned and rewaxed where applicable (VCT Tile); vinyl plank flooring should be cleaned with appropriate cleaning solution and dried. • Clean and lubricate window tracts. • Remove and clean security screens / re-install, clean exterior and interior windows and windowsills / Security screens will be re-installed at the end of each workday. • Install window blinds and curtain rods. • Clean stove and refrigerator. • Clean both Kitchen and Bath cabinets to include the top of the kitchen cabinets. • Clean entire unit when complete. • Remove all debris from front and back yard. • Remove all spider webs and wasp nests from underneath soffit.

Details

Single-Family Homes, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents