Similar Projects
Reported | 12/20/2021 01:40 PM |
Project Title | Additional Lanes on Leon Smith Parkway |
Physical Address | View project details and contacts |
City, State (County) | Oxford, AL 36203 (Calhoun County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $9,608,821 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Constructing the following: Additional lanes on leon smith parkway from boiling springs road to jimmy hinton drive grade, drain, base and pave, bridge widening, striping and signals in the city of oxford. The principal items of work are approximately as follows: 4100 cy of unclassified excavation, 19,084 cy of borrow excavation, 6430 tons of asphalt paving, 176,700 lbs of steel reinforcement for the widening of two bridges, 6 signalized intersections and other miscellaneous items for roadway construction including striping, traffic control and erosion control items. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |