Similar Projects
Pavement and Rehabilitation Pedestrian Connection Improvements, North I, 2022
Infrastructure
Bidding
DE

New Sussex County Family Court Building
Infrastructure
Bidding
Georgetown, DE 19947

Delaware Avenue Sidewalk Replacement
Post-Bid
Laurel, DE 19956

Open-End Pedestrian Access Routes and Sidewalk Improvements
Infrastructure
Post-Bid

Wilmington DMV - Phase 1 Lobby Renovation
Renovation, Demolition
Results
New Castle, DE 19720

Millsboro Main Street Sidewalk Replacement Project
Results
Millsboro, DE 19966

Conwell Street Green Infrastructure Installation
Infrastructure
Bidding
Seaford, DE

Biden Storm Water and Curbing Repair
Infrastructure
Post-Bid
New Castle, DE

JP 7 - Exterior Renovations
Results
Dover, DE 19904

Towers Beach Parking Lot Renovations
Infrastructure
Bidding
Dover, DE 19901

West State Street Sidewalk Replacement
Infrastructure
Post-Bid
Millsboro, DE 19966

Junction and Breakwater Pathway, Rehoboth Beach Extension
Results
Less than $513,294 est. value
Rehoboth Beach, DE 19971

Munchy Branch Road Multi-Use Trail
Infrastructure
Bidding
DE

Municipal Building Parking Lot Project
Infrastructure
Post-Bid
Smyrna, DE 19977

Garrison's Lake Boat Ramp Reconstruction
Results
Little Creek, DE 19901

Reported 03/17/2022 12:00 AM
Project Title

Augustine Cut Off Bicycle Network Improvements

Physical Address View project details and contacts
City, State (County) New Castle, DE   (New Castle County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bicycle and pedestrian improvements along Augustine Cut Off that will link the state’s two largest population centers, the City of Wilmington and Brandywine Hundred, by connecting the greater Blue Ball/US 202 Pathway system to Trolley Square and the Brandywine Park trail network.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents