Similar Projects
Raw Water Intake Mitigation
Infrastructure
Bidding
Lumberton, NC 28360

Feedwater Pump Replacement and Installation - 21
Infrastructure
Bidding
Greensboro, NC

Rebuilding of Pumps for Fuel Farm
Post-Bid
Elizabeth City, NC 27909

Burton Park Castle Hayne Monitoring Wells
Post-Bid
Jacksonville, NC 28541

Bladen County Water District - Phase IV, Contract 2 - Production Well Project
Results
NC

Contract III - 2020 USDA Well Building Improvements
Results
Red Springs, NC 28377

ABS Pump for Arlington West Pump Station
Infrastructure
Bidding
Jacksonville, NC

Replacement Parts for Pumps
Post-Bid
Jacksonville, NC 28540

C and D RAS Pump Rehabilitation
Results
Less than $6,000,000 est. value
Rocky Mount, NC 27801

Ostwalt Amity Area Water System Expansion Contract II - Well Buildings
Post-Bid
NC

Well Supply System Disinfectant Modifications and Distribution System Improvements
Results
$400,000 est. value
Hot Springs, NC 28743

Lower Rocky River Pump Station Screening and Influent Gate Replacement
Post-Bid
Harrisburg, NC 28075

Bypass Pumping for Declared Emergencies
Term Contract
Results
Charlotte, NC 28216

Turbo Molecular Vacuum Pump
Post-Bid
Raleigh, NC 27695

Construction of 2 New Water Supply Wells Serving
Results
Less than $392,000 est. value
Wallace, NC 28466

Reported 11/18/2021 12:00 AM
Project Title

Provide Pump Hoist PS 125

Physical Address View project details and contacts
City, State (County) Cherry Point, NC   (Craven County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the supply and installation of a monorail, support frame, a 1 ton hoist and incidental related work. The contractor will be required to lift the existing pumps out of the sump to make the attachments of the new wire lift assemblies to the pumps. This will involve using the existing chain system and a lift truck. This work will require close coordination with base maintenance staff.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents