Similar Projects
Bingham Creek Regional Park Phase 2
Post-Bid
Salt Lake City, UT

Aqua Tots Swim Schools
Renovation - 5,600 SF
Post-Bid
Midvale, UT 84047

Oquirrh Hills Golf Course Pavilion
New Construction - 3,140 SF
Results
Tooele, UT 84074

Park Pavilion
Term Contract
Results
Less than $800,000 est. value
Murray, UT 84107

Park Concessions Building Project
New Construction, Demolition - 900 SF
Construction
West Bountiful, UT 84087

Viewmont High School Baseball Field Renovation
Construction
Bountiful, UT 84010

Nordic Valley Expansion
New Construction
Pending Verification
$6,500,000 est. value
Eden, UT

Construction Of New Baseball Dugouts
New Construction
Post-Bid
Tabiona, UT 84072

Steed Park Pickleball Design/Build
Results
Less than $350,000 est. value
Clearfield, UT 84015

Press Box Buildings and Coaches Offices at Hunter High School
Construction
West Valley City, UT 84120

Clyde Rec Center Pickleball Courts Project
Post-Bid
Springville, UT

2020 Park Improvements
Results
Draper, UT

RAC Shade Structure
Post-Bid
Salt Lake City, UT 84114

Dfcm Construction-Willard Bay State Park Day Use Pond Improvements-19074510
Results
Less than $375,000 est. value
Willard, UT

Homestead Park Pavilion
Renovation
Post-Bid
Riverton, UT 84065

Last Updated 07/23/2020 02:37 PM
Project Title

Bristlecone Pond Trail Engineering Services

Physical Address View project details and contacts
City, State (County) Brian Head, UT 84719   (Iron County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The trail is approximately 2900 FT in length and 10 FT wide. The Trail will be constructed on the existing slope with cut and fill to be kept to a minimum. Asphalt depth is 2.5 inches over 6 IN of compacted road base. The proposed trail expansion is located on the West Side of Highway 143 starting at approximately mile 15.4 and ending at approximately 15.9. Bristlecone Pond Trail is approximately 2150 FT in length and 10 FT wide. The connecting trail to the Chair one Restroom is approximately 500FT in length and 8FT wide. The trail will be constructed on the existing slope with cut and fill to be kept to a minimum. Asphalt depth is 2.5 inches over 6 inches of compacted road base.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents