Similar Projects
HVAC System Replacement
Renovation, Alteration
Results
Potlatch, ID

Gas Fired Boilers
Alteration
Results
Less than $200,000 est. value
Twin Falls, ID 83301

Magic Valley Regional Airport - Terminal Heat Pump Replacement
Alteration
Post-Bid
Twin Falls, ID 83301

Acoustic Mitigation Isolation, Phase 1
Renovation, Alteration
Results
$2,400,000 est. value
Moscow, ID

Dehumidification Replacement
Alteration
Results
Idaho Falls, ID

Center Chiller Replacement
Alteration
Results
$360,000 est. value
Boise, ID 83725

Air Handling Unit Installation Project
Alteration
Post-Bid
Burley, ID

Boise Airport Chiller Addition
Alteration
Results
Boise, ID 83705

Replace Chiller, Data Room
Alteration
Post-Bid
$179,000 est. value
Boise, ID 83702

City Hall Annex - HVAC
Alteration
Results
Boise, ID 83702

Last Updated 01/19/2022 10:36 AM
Project Title

Cold Storage Maintenance

Physical Address View project details and contacts
City, State (County) Coeur d'Alene, ID 83815   (Kootenai County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status All Bids Rejected, Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Coeur D'Alene Nursery: Provide all supplies and services specified, and effective for the period stated, in the Schedule. The components were installed as a new system in 2003 and have been in operation since 2004. Mechanical components of the compressors have worn over time due to the constant operation since 2004. The compressor unit on Compressor #2 was replaced in 2021. Power outages and Power surges have shortened the life of the variable frequency drives, damaging internal components. The Variable Frequency Drives (VFD) regulate power usage as the system components ramp up or down to meet cooling requirements, saving energy. Currently the drives are not able to operate the compressors, one of the fans on the condenser tower and two cold storage rooms. Service maintenance is required on both compressor units due to system age and serviceable parts wearing out for the system. The VFDs that operate the compressors and one condenser fan and two cooler rooms also need to be replaced because of failed internal components.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Refrigerant Compressors, Packaged Compressor and Condenser Units, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents