Similar Projects
Bid Package #2 - Additions and Renovations to Bibich Elementary - Building Package
Addition, Demolition, Renovation, Infrastructure
Design
$9,434,204 CJ est. value
Dyer, IN 46311

Bid Package #2 - Additions and Renovations to Bibich Elementary - Building Package
Addition, Demolition, Renovation, Infrastructure
Design
$9,434,204 CJ est. value
Dyer, IN 46311

RFP Engineering- Perpetuation - Noise Barrier Wall Evaluation
Infrastructure
Bidding
$2,000,000 CJ est. value
Hammond, WI 54015

Whiting Center Street 119th Street to Grenchik Lane
Infrastructure
Bidding
$470,000 CJ est. value
Whiting, IN 46394

Douglas MacArthur ES
Renovation, Addition
Post-Bid
Cedar Lake, IN 46303

D/B - 2022 School Facilities Improvements Project
New Construction
Post-Bid
$11,800,000 est. value
Griffith, IN 46319

Hanover New Upper Elementary School and Related Work
Results
Cedar Lake, IN 46303

Hobart Community Pool Site Improvements-Phase 2
Results
Hobart, IN 46342

Centerpoint BioFuels Plant
New Construction, Infrastructure
Pending Verification
$600,000,000 CJ est. value
Gary, IN 46406

Lowell Animal Hospital
New Construction, Infrastructure
Pending Verification
Lowell, IN 46356

Munster Church
Addition, Demolition, Build-out, Infrastructure - 20,490 SF
Design
$800,000 CJ est. value
Munster, IN 46321

2023 Dyer Street Reconstruction Projects
Infrastructure
Bidding
$300,000 CJ est. value
Dyer, IN 46311

Bibich ES Additions and Renovations - Site Work Package
Infrastructure
Post-Bid
$1,000,000 est. value
Dyer, IN 46311

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Two Hearts Homes for Seniors Assisted Living Facility / Crown Point
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Crown Point, IN 46307

Last Updated 08/02/2022 10:07 AM
Project Title

Bid Package #3 - Additions and Renovations to Bibich Elementary - Mechanical/Electrical Package

Physical Address View project details and contacts
City, State (County) Dyer, IN 46311   (Lake County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $3,238,550 [brand] Estimate
Plans Available from Copy Center - 06/03/22
Owner View project details and contacts
Architect View project details and contacts
Description

Lake Central Scholl Corporation has to delay the Bibich Elementary School Expansion project due to the bids being significantly over budget. Bids for the following trade packages are requested: Trade Package #1 - Mechanical Trade Package #2 - Electrical Trade Package #3 - ACT and Trim Work Bidders submitting proposals for more than one of the trade packages above, should submit separate proposals for each package. Refer to the INSTRUCTION to BIDDERS, for other details regarding the sealed bid proposals required. Bid Security - A Bid Bond in the amount of ten (10) % of the amount of the Bid, must accompany each Bid in accordance with the Instructions to Bidders. Bids shall be executed in accordance with Indiana Board of Accounts Form No. 96 (Current Revision) - Contractor's Bid for Public Works (available at:portal), with a financial statement complying with Section III of Form No. 96, Supplemental Bid Form (Document 004113), a satisfactory Bid Bond, or certified check pursuant to I.C. 36-1-12-4.5, payable All trade packages will be awarded, and contracted with Lake Central School Corporation, based on bids received from pre-qualified tier 1 bidders. Award of contracts will be in accordance with Indiana Public Bidding laws. Bidder receiving the award shall furnish an approved one hundred percent (110%) Performance Bond and a one hundred percent (110%) Labor and Materials Payment Bond which cover faithful performance of the Contract and the payment of all obligations arising thereunder. Said bonds shall remain in full force and effect for eighteen (18) months from the date of acceptance of the Work. Construction shall be in full accordance with the Bidding Documents. All Tier 1 bidders are suggested to complete and submit a Pre-qualification Form prior to bid submission deadline. Bidders may request the Pre-qualification Form and the Bid Documents electronically by emailing such requests to peterwintersteen@coreconstruction.com and are also encouraged to sign up with Building Connected. There is no cost for electronically downloaded documents. The Owner and the Construction Manager reserve their rights to accept or reject any bid (or combination of bids) and to waive any irregularities in bidding. All bids may be held for a period not to exceed 60 days before subcontract awards. Custom Bid Result Circle R Mechanical - HVAC and Mechanical 2,599,000 Sargent Electric Electrical 350,220 Kleckner Interior Systems ACT and Trim Work 289,330

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Humidity Control Equipment, Mechanical Dehumidification Units.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents