Similar Projects
Newfound Creek No. 1 and No. 2 Pump Station Improvements
Renovation
Bidding
$3,600,000 est. value
Birmingham, AL

Pepperell Parkway Water Main Replacement Phase I
Infrastructure
Bidding
Opelika, AL 36801

Rehabilitation of Pumping Station No. 2
Post-Bid
Less than $110,000 est. value
Samson, AL

Wastewater Treatment Plant Upgrades
Post-Bid
Less than $1,500,000 est. value
West Blocton, Woodstock, AL

South Parkway Raw Water Pump Station Improvements
Results
Less than $2,294,106 est. value
Huntsville, AL 35804

Swing Check Valve
Results
Less than $44,800 est. value
Huntsville, AL 35804

Brookwood Parkway Water Main
Infrastructure
Construction
Vance, AL 35490

Crisstown Road Water Main Replacement
Infrastructure
Construction
$200,000 est. value
Tuscaloosa, AL

Magnolia Grove Lift Station and Force Main
New Construction, Infrastructure
Bidding
Mobile, AL

Eastlake Phase I
Post-Bid
Birmingham, AL 35283

SR 9 Water Line Relocation
Results
Less than $291,830 est. value
Fort Payne, AL 35968

Contract No. 1 - 600 GPM Booster Pump Station
New Construction
Bidding
$375,000 est. value
Sardis City, AL

Installation of Water Mains and Appurtenances Connected Thereto and 43 Water Services
Post-Bid
Birmingham, AL 35283

Natural Gas Line Relocation SR 9 Water Line
Results
Less than $233,000 est. value
Fort Payne, AL 35967

Installation of Water Mains and Appurtenances Connected thereto and 158 Water Services
Post-Bid
Birmingham, AL 35283

Reported 01/08/2022 12:00 AM
Project Title

Water Main Improvements

Physical Address View project details and contacts
City, State (County) Loachapoka, AL   (Lee County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Prefabricated Booster Pumping Station: Construct and install one (1) factory built, above-ground booster pumping station at the location shown on the plans. The booster pumping station shall be complete with all the necessary equipment installed on a fabricated steel base. The installation shall include the booster pumping station and housing.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents