Similar Projects
Window Replacement and Facade Repairs at Beatley Library
Bidding
Alexandria, VA 22304

Roof, Window, Door and Lighting Replacements Project Animal Husbandry Barn Building 0550
Bidding
Blacksburg, VA 24060

Caulking for Windows at the Meyera E. Oberndorf Central Library
Post-Bid
Virginia Beach, VA

City Hall Painting and Window Repair Project
Post-Bid
Alexandria, VA

CP Door Removal and Installation
Results
Norfolk, VA

Overhead, Roll Up, Folding and Bay Door Testing, Inspection and Repair
Term Contract
Results
Arlington, VA 22204

Administration Building Window and Cornice Repainting
Bidding
Chesterfield, Richmond, VA 23235

GWMP: ARHO INT Storm Window Inserts
Post-Bid
Arlington, Fort Myer, VA 22211

Transit Maintenance Overhead Steel Roll Up Doors
Results
$46,000 est. value
Blacksburg, VA 24060

Five Below
Renovation - 8,118 SF
Post-Bid
Winchester, VA 22601

Removal and Replacement of Sliding Glass Doors
Results
Chesapeake, VA 23322

Doors Flush Lauan Unfinished Hollow Core Veneer Slab
Post-Bid
Norfolk, VA 23510

Detention Doors, Frames, and Hardware
Results
State Farm, VA 23160

Window Film for Senior Center and Two Voter Registrar Locations
Post-Bid
Yorktown, VA 23690

Glass/Glazing Services
Term Contract
Results
Radford, VA 24142

Reported 06/09/2020 12:00 AM
Project Title

ADA Door Renovation and Installation

Physical Address View project details and contacts
City, State (County) Norfolk, VA 23511   (Norfolk City County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

- Location 1 Contractor shall demolish the current non-compliant door and doorway that grants access to the women’s restroom located on the Kennedy Hallway. Contractor shall widened doorway to accommodate ADA specifications. Contractor shall installation a new lentil to enable the wider opening. Contractor shall install new Hollow Metal Frame and Right Hand In-Swing Door with all required ADA compliant hardware. Finally, contractor shall install a head mounted Powered Door Opener along with Interior and Exterior Push Plate Stations for ADA compliant control of the doors. - Location 2 Contractor shall demolish the existing Hollow Metal Doors. Contractor shall re-use Hollow Metal Frame to install a new pair of custom Offset Hollow Metal Doors that meet ADA requirements. Contractor shall install new doors using all new ADA compliant hardware, and shall also install a surface mounted Powered Door Opener w/ delayed door close ability. Contractor shall install Interior and Exterior Push Plate Stations for ADA compliant control of the doors. Contractor shall integrate Push Plate Stations with the Card Reader System installed to secure MARMC Spaces. - Location 3 Contractor shall demolish existing overhead Door Closure Arms and existing Weather Stripping. Contractor shall re-install existing Hollow Metal Doors and Frame with a new “Dual” Motorized Door Operator with Exit Delay Opening Module. Contractor shall install Interior and Exterior Push Plate Stations for ADA compliant control of the doors. Contractor shall integrate Push Plate Stations with the Card Reader System installed to secure MARMC Spaces. Also, contractor shall install all ADA compliant hardware along with new Brush Weather Stripping between doors as well as Brush Door Sweeps. - Location 4 Contractor shall remove the existing surface mounted Door Closer Arm. Contractor shall re-use existing Wood Door, Hollow Metal Frame, Hinges, Exit Device, and Strike. Contractor shall install a new Motorized Door Operator with Exit Delay capability. Contractor shall install Interior and Exterior Push Plate Stations for ADA compliant control of the single door. Contractor shall integrate Push Plate Stations with the Card Reader System installed to secure MARMC Spaces.

Details

Division 08 - Openings, Doors and Frames.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents