Similar Projects
ANR FWL Front Line Rearing Ponds Improvements
Infrastructure
Bidding
Bennington, VT 05201

Grove Street at Mineral Street Storm Drain Improvements
Infrastructure
Bidding
Springfield, VT 05156

Garvin Hill Road and Grout Road Project
Infrastructure
Post-Bid
$25,000 est. value
Hartland, VT

Chester TAP TA17(9)
Infrastructure
Post-Bid
$500,000 to $1,000,000 est. value
Chester, VT

North Troy LPOE Site Civil Repairs
Results
North Troy, VT 05859

Proposed Densmore Drive Culvert Replacement
Results
$900,000 to $1,200,000 est. value
Essex, VT

Clif Reynolds Road Culvert Replacement
Infrastructure
Bidding
$300,000 to $400,000 est. value
Cambridge, VT 05464

Town Line Road Culvert Replacement
Infrastructure
Post-Bid
Mendon, VT 05701

Beanville Road Culvert Replacement
Results
Randolph, VT 05060

Andrews Road Culvert Replacement
Infrastructure
Bidding
$200,000 to $300,000 est. value
Cambridge, VT 05464

Davis Road Box Culvert
Infrastructure
Post-Bid
Royalton, VT 05063

Lewis Creek Streambank Repair Off Ireland Road
Results
$30,200 est. value
Bristol, VT

Colchester HES NH 5600(14) C/1
Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value
Winooski, VT

Bovat Road Culvert Replacement
Infrastructure
Post-Bid
Georgia, VT 05478

SFY2021 Deer Brook Gully Stabilization and Stormwater Mitigation Project
Results
Less than $400,000 est. value
Georgia, VT

Reported 03/05/2022 12:00 AM
Project Title

Materials Recovery Facility Single Stream System Design

Physical Address View project details and contacts
City, State (County) Chittenden, VT   (Rutland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To provide equipment, system design, fabrication, installations, start-up, acceptance testing, and system training for a turn-key Single Stream Materials Recycling System.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents