Similar Projects
Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Design
$10,000,000 to $25,000,000 est. value

Granular Surfacing of Roadway
Infrastructure
Bidding

Wisconsin & 35th Street Roundabout
Infrastructure
Bidding
Le Claire, IA 52753

Hillandale Road and North West Boulevard, 76th Street and North West Boulevard
Infrastructure
Post-Bid
Davenport, IA 52805

PCC Patching
Infrastructure
Post-Bid
IA

Indiana Avenue Friction Seal
Infrastructure
Results
Bettendorf, IA

23rd Street Reconstruction
Infrastructure
Results
Bettendorf, IA

2022 PCC Panel Replacements
Infrastructure
Bidding
Le Claire, IA

Pleasant View ES 2022 Access Drive Improvements
Infrastructure
Post-Bid
Bettendorf, IA 52722

Marquette and West 12th Street Replacement
Infrastructure
Results
Davenport, IA

41st Street Reconstruction (Sturdevant Street To Marquette Street)
Infrastructure
Bidding
Davenport, IA 52806

Eldridge SRF Water Quality Improvements - Permeable Pavement Alleyway
Infrastructure
Post-Bid
Eldridge, IA

Middle Road Rehabilitation
Infrastructure
Results
Bettendorf, IA

FY23-24 Contract Sewer Repair Program
Term Contract
Bidding
Davenport, IA

Pershing Avenue Resurfacing
Infrastructure
Post-Bid
Davenport, IA 52805

Last Updated 03/09/2022 10:03 AM
Project Title

Gretchen Court Reconstruction Project

Physical Address View project details and contacts
City, State (County) Bettendorf, IA 52722   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed improvements consist of reconstructing approximately 376 lineal feet of thirty-one foot (31’) wide existing concrete pavement with new six-inch (6”) Portland Cement Concrete (PCC) pavement on a drainable subbase with sub-drains on Gretchen Court. Also included with this project is the removal and replacement of driveway approaches, partial construction of sidewalks, manhole adjustments, sodding, erosion control, and other work related to reconstructing this street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents