Similar Projects
Replace Sewer Lines and Infrastructure Ozark Correctional Center
Infrastructure
Bidding
$200,000 CJ est. value
Fordland, MO 65652

Duello Road Phase 3A Watermain Relocation
Infrastructure
Bidding
$150,000 CJ est. value
Lake Saint Louis, MO 63367

Morris Pump Nc 12x14-25 Replacement Parts
Renovation
Sub-Bidding
$150,000 CJ est. value
Springfield, MO 65804

Rockhill Steam Line Replacement
Renovation, Alteration
Post-Bid
$1,453,000 est. value
Kansas City, MO 64110

Plumbing Services
Alteration
Post-Bid
MO

District Wide Drinking Fountain/Bottle Filler Installation
Alteration
Results
Hazelwood, MO

McCracken Road Dam Rehabilitation
Infrastructure
Results
$2,000,000 CJ est. value
Ozark, MO 65721

Plumbing
Renovation
Construction
$16,000 CJ est. value
Saint Charles, MO 63301

Route Z and Interstate Drive Intersection Improvements
Infrastructure
Bidding
$1,500,000 CJ est. value
Wentzville, MO 63385

Pump and Triple Duty Valve Replacement - Hazelwood Opportunity Center
Alteration
Post-Bid
$30,000 est. value
Spanish Lake, MO 63138

Installation of Flow Meter
Infrastructure
Results
$126,365 CJ est. value
Saint Louis, MO 63103

CHT Fuel - Install New 12,000 Gallon AST 100LL AvGas Fuel System
Renovation
Bidding
$280,000 CJ est. value
Chillicothe, MO 64601

Plumbing Services 2022
Term Contract
Post-Bid
Saint Louis, MO 63110

Eltora Wet Weather Storage Facility
Demolition, New Construction, Infrastructure
Results
$187,986 CJ est. value
Saint Louis, MO 63130

Frontier Park and Rose Brae Stormwater Projects
Infrastructure
Bidding
$100,000 CJ est. value
Saint Charles, MO 63301

Last Updated 08/15/2023 03:03 AM
Project Title

Pipe Replacement - Route 141

Physical Address View project details and contacts
City, State (County) Arnold, MO 63010   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job JSLM0034 Route 141 JEFFERSON County. Pipe replacement at Fiedler Lane (Springdale Blvd.) in Jefferson County, the total length of improvement being 0.004 miles. Range: $100K to $250K Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. All Questions Concerning the Project Should Be Directed to the Project Contact Listed in the Job Special Provisions of the Request for Bid. All Questions Concerning Bid Document Preparation Can Be Directed to the Central Office - Design Division at (573) 751-2876. Contract Time: 7/1/24 MO DOT- F04- Pipe Replacement - Route 141 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents