Similar Projects
DFCM Construction - Pre Qualified Roofing - SUU General Classroom Building Roof Replacement
Alteration
Bidding
Less than $200,000 est. value
Cedar City, UT 84720

Maintenance Projects Waterproofing Masonry Clean and Re-Seal Re-Roof Project
Alteration
Bidding
Provo, UT

Re-Roofing of Pavilion at Nielsen`s Grove Park
Post-Bid
Orem, UT 84058

Oak City Roof Replacement
Renovation - 38,500 SF
Post-Bid
Oak City, UT

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Provo Peaks Elementary School Reroof
Alteration
Bidding
Provo, UT 84606

Box Elder Middle School Partial Re-Roof
Post-Bid
Perry, UT 84302

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Granger-Hunter Improvement District Building B Reroof
Alteration
Bidding
$100,000 est. value
West Valley City, UT 84119

Re-Roof
Post-Bid
Kanab, UT 84741

Dfcm Construction - Pre Qualified Roofing - Usdc Old Administration Bldg Roof Replacement
Results
Less than $150,000 est. value
American Fork, UT

BYU Lavell Edwards Stadium Concession Roof Replacement
Renovation - 13,863 SF
Post-Bid
Provo, UT 84604

Dfcm Construction - Pre Qualified Roofing - Usdc Heather And Tlc Buildings Roof Replacement
Results
Less than $150,000 est. value
American Fork, UT

Cottonwood 2, 14
Renovation
Post-Bid
Salt Lake City, UT 84117

Last Updated 06/15/2021 05:21 PM
Project Title

Northridge High School C-Hall Partial Roof Replacement

Physical Address View project details and contacts
City, State (County) Layton, UT 84041   (Davis County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Partial roof replacement at Northridge High School C-HALL. The Work includes, but in not necessarily limited to, the following: a. Partial demolition of the existing built-up roofing. b. Installation of new roofing system, roof insulation, and sheet metal flashing. c. Raising of existing roof top mounted mechanical and plumbing equipment to accommodate new roof insulation requirements. This work will also involve the extension of mechanical ductwork and piping to accommodate the additional height. d. Removal of existing skylights and installation of new skylight units on raised curbs. e. Removal and reinstallation of existing parapet access ladders. f. Curbs and flashing for existing equipment, vents, etc

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents