Similar Projects
Fucci Warehouse
New Construction
Conception
Auburn, AL 36830

Joe Mallisham Parkway Sites
New Construction
Conception
Tuscaloosa, AL

Conecuh Ridge Distillery
New Construction - 26,319 SF
Design
$14,000,000 to $15,000,000 est. value
Troy, AL 36082

Skyland Self Storage Facility
New Construction
Design
Tuscaloosa, AL 35405

Jemison High School Field Houses
New Construction, Renovation - 8,400 SF
Bidding
$3,500,000 CJ est. value
Huntsville, AL 35810

Storage Fixtures Facilities Warehouse Building
New Construction
Bidding
Mobile, AL

Construction of Pre-Fabricated Metal Building
Post-Bid
Hazel Green, AL 35750

Mallard Fox Creek Port Cottonseed Warehouse and Storage Facility
Post-Bid
Decatur, AL 35601

RMACC-Phase II-Hazardous Devices School Fuselage Training Facility
Results
$500,000 to $1,000,000 est. value
Redstone Arsenal, AL

Aircraft and Flight Equipment Building, Redstone Arsenal, Alabama
- 60,000 SF
Results
$25,000,000 to $100,000,000 est. value
Redstone Arsenal, AL 35898

Climate Storage - Phase II
New Construction, Demolition - 38,049 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Birmingham, AL 35213

Ben E. Keith
New Construction - 423,681 SF
Construction
$100,000,000 est. value
New Brockton, AL 36351

Logistics Park
New Construction
Pending Verification
$16,000,000 est. value
Mobile, AL

Cypress Business Park Logistics Subdivision
New Construction
Pending Verification
Mobile, AL 36619

Construction of 45,000 SF Metal Building, Geneva County Industrial Park
- 45,000 SF
Post-Bid
Geneva, AL 36340

Last Updated 10/11/2021 11:08 AM
Project Title

Hangar E - Part A

Physical Address View project details and contacts
City, State (County) Meridianville, AL 35759   (Madison County)
Category(s) Commercial, Transportation
Sub-Category(s) Aircraft Hangar, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Part A bid package: will be an eight unit corporate hangar metal building package to be manufactured and delivered to the airport. Each hangar unit will be approximately 60' x 60'.

Details

Aircraft Hangar, New Construction, Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents