Similar Projects
2022 Sanitary Sewer Collection Improvements
Demolition, New Construction, Infrastructure
Design
$3,149,154 CJ est. value
Winger, MN 56592

Hastings HS Valve & Fitting Replacement
Post-Bid
Hastings, MN 55033

Water Softener Installation
Post-Bid
Faribault, MN

Plumbing Service
Term Contract
Results
$250,000 est. value
Moorhead, MN

Victaulic Piping Replacement
Results
$863,000 est. value
MN

2022 Seasonal Work and Materials
Term Contract
Post-Bid
Faribault, MN

Lincoln ES Domestic Piping Replacement
Results
White Bear Lake, MN 55110

Pipe Insulation
Term Contract
Post-Bid
MN

John Rich Fountain
Alteration
Results
Red Wing, MN 55066

Plumbing Services at all MCES Locations
Alteration
Post-Bid
Minneapolis, MN

General Contractor for 1314 North 44th Avenue Piping
Alteration
Results
Minneapolis, MN 55412

Twin Cities Habitat for Humanity Plumbing
Alteration
Post-Bid
Saint Paul, MN 55106

Century High School - Pool Addition - Bid Package 02
Alteration
Results
Rochester, MN 55906

Birch Lake ES Domestic Piping Replacement
Alteration
Post-Bid
White Bear Lake, MN 55110

Curling Facility Refrigeration System Replacement
Renovation, Alteration
Results
Duluth, MN 55802

Last Updated 08/25/2022 06:03 PM
Project Title

Hot Water System Upgrade Building 22 at the Minnesota Veterans Home Minneapolis

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55417   (Hennepin County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $195,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 4 , 2022, this project has not yet been awarded. A timeline for award has not yet been established.** State Project Number 75MP0099 Hot Water System Upgrade Building 22 at Minnesota Veterans Home Minneapolis This project is Targeted Group/Economically Disadvantaged/Veteran-Owned (TG/ED/VO) certified small business preference.> A. The work will done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1.) Providing a new stand-alone domestic hot water system to serve Building B-22.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents