Similar Projects
Pinewood Townhomes
New Construction, Infrastructure
Conception
$66,000,000 CJ est. value
Chattanooga, TN 37421

Alton Park Connector - City of Chattanooga
Infrastructure
Conception
$5,500,000 CJ est. value
Chattanooga, TN 37402

Embassy Suites / Chattanooga
New Construction, Infrastructure - 153,536 SF
Design
$3,000,000 CJ est. value
Chattanooga, TN 37402

The Bend - Mixed-Use District
New Construction, Infrastructure - 192,000 SF
Design
$4,000,000,000 CJ est. value
Chattanooga, TN 37402

Multiple Tennis Court Improvements
Infrastructure
Bidding
$220,000 CJ est. value
Chattanooga, TN 37402

Modifications to Birchwood Landfill Gas Extraction System Additions
Infrastructure
Bidding
$116,000 CJ est. value
Harrison, TN 37341

899 Cherokee Condominiums
New Construction, Alteration - 18,466 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Chattanooga, TN 37405

Jack's Family Restaurant- Collegedale
New Construction - 3,835 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Ooltewah, TN 37363

World-Wide Water Storage Tank Remediation
Term Contract
Results

Fuller Tank Improvements
Infrastructure
Results
Soddy Daisy, TN 37379

Ridgeview at Northpoint Apartments
New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
Chattanooga, TN 37415

North River Commerce Center
New Construction, Infrastructure - 800,000 SF
Pending Verification
$102,000,000 CJ est. value
Chattanooga, TN 37415

Main Street Affordable Housing Development
New Construction, Infrastructure - 18,000 SF
Pending Verification
$23,000,000 CJ est. value
Chattanooga, TN 37404

Midtown Pathway - City of Chattanooga
Infrastructure
Conception
$3,000,000 CJ est. value
Chattanooga, TN 37411

AutoZone #5517 / Chattanooga
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Chattanooga, TN 37421

Last Updated 02/21/2023 12:05 PM
Project Title

Wet Weather Storage Phase 4 South Chickamauga PS

Physical Address View project details and contacts
City, State (County) Chattanooga, TN 37402   (Hamilton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of constructing one 10 million-gallon (MG) wastewater storage facility. Space for a second future wastewater storage facility of similar size. The wastewater storage facility will be located on City owned property located at 4079 N. Hawthorne St. Chattanooga, TN 37406. Additional items at the wastewater storage facility includes (but is not limited to) the following: Diversion structure 30 million gallon per day (MGD) pump station Site utilities including gravity sewer, force main, yard piping, and site water Electrical building, process controls and instrumentation Odor control system Site work including clearing, excavation, backfilling, and final grading Retaining wall Access road Temporary Greenway Erosion prevention and sediment control The Project allotted time for construction is: 720 days This project is being funded by a State Revolving Fund loan on or after 2014 EPA Fiscal Year. The loan recipient must be in compliance with all applicable Davis-Bacon Act and American Iron and Steel requirements. Disadvantaged Business Enterprises (DBE) Requirements. Documents information : Prior to mailing the check you can scan and email a copy to bidinfo@chattanooga.gov. Once the email has been received with a copy of the check the requested bid documents will be emailed. No part of the purchase price will be refunded. W-18-015

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents