Similar Projects
Parrish Farms - Master Plan
New Construction - 4,000,000 SF
Conception
$10,000,000 CJ est. value
FL

Thermo King
New Construction - 330,825 SF
Conception
Fort Pierce, FL 34945

Big Bend Logistics
New Construction - 402,156 SF
Design
$44,000,000 est. value
Gibsonton, FL 33534

Tribute Boats
New Construction - 161,300 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Stuart, FL 34997

Romanelli Warehouse
New Construction - 20,000 SF
Sub-Bidding
$3,000,000 est. value
Fort Pierce, FL 34983

Festival Industrial
New Construction - 138,992 SF
Post-Bid
$2,000,000 est. value
Pompano Beach, FL 33069

Harolena Persad Industrial
New Construction - 8,043 SF
Post-Bid
$400,000 est. value
Port Saint Lucie, FL 34952

Unit 3 Barn Improvements (Barn Bathroom Install)
New Construction
Results
$50,000 to $70,000 est. value
Lake Placid, FL 33852

Flexsol Packaging
Addition - 72,700 SF
Construction
$1,500,000 est. value
Pompano Beach, FL 33069

Jensen Beach Auto Vault
New Construction - 231,075 SF
Construction
$2,999,998 est. value
Jensen Beach, FL 34957

Jansteel
New Construction - 69,678 SF
Pending Verification
$2,000,000 est. value
Port Saint Lucie, FL 34981

The Home Deport
New Construction - 640,000 SF
Pending Verification
$10,000,000 CJ est. value
Miami, FL

Hawthorne Industry Park
New Construction - 3,650,000 SF
Conception
$10,000,000 CJ est. value
Hawthorne, FL

Industrial Office/Warehouse
New Construction - 22,960 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Saint Lucie West, FL 34986

A Great Home
New Construction, Build-Out - 25,320 SF
Post-Bid
$1,000,000 est. value
Saint Lucie West, FL 34986

Last Updated 06/09/2022 10:11 AM
Project Title

South Martin Industrial Park - Kansas West

Physical Address View project details and contacts
City, State (County) Stuart, FL 34997   (Martin County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse
Contracting Method
Project Status Construction Commenced June 2021, Construction Complete as of May 2022
Bids Due View project details and contacts
Estimated Value $12,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of 9 buildings. Phase 1: Per the phasing plan (located in Phasing File) Phase 1 will include building #’s 1, 3, 7, 8 and 9 and associated sitework / infrastructure. Pricing should assume an April 2021 start. • Building #1 – shell / core only, no demised spaces. • Building #3 – assume shell / core only, no SOG, no demised spaces; assume floor plan similar to Building #1. • Building #7 – white box with office and restroom. Please separate the shell/core and interior costs. • Building #8 – shell/core only; demised as shown on the plans. • Building #9 – shell/core only; demised as shown on the plans. Phase 2: Per the phasing plan (located in Phasing File), Phase 2 will include building #’s 2, 4, 5 and 6 and associated asphalt, concrete, curbs, etc. Please provide pricing for these buildings based on the Phase 1 building plans. • Building #2 – similar to Building #1, but smaller SF • Building #’s 4, 5 and 6 – cold, dark shell; demised as shown on the plans; similar to Building #’s 8 and 9 with adjusted SF.

Details

96,231 SF - 1 Industrial Warehouse, 1 Story Above Grade, 18,888 SF New Construction, 1 Industrial Warehouse, 1 Story Above Grade, 14,610 SF New Construction, 1 Industrial Warehouse, 1 Story Above Grade, 4,586 SF New Construction, 1 Industrial Warehouse, 1 Story Above Grade, 11,697 SF New Construction, 1 Industrial Warehouse, 1 Story Above Grade, 11,649 SF New Construction, 1 Industrial Warehouse, 1 Story Above Grade, 5,825 SF New Construction, 1 Industrial Warehouse, 1 Story Above Grade, 3,810 SF New Construction, 1 Industrial Warehouse, 1 Story Above Grade, 7,571 SF New Construction, 1 Industrial Warehouse, 1 Story Above Grade, 7,579 SF New Construction, 11.54 Acres.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents