Similar Projects
South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

SHIP Housing Program Project
New Construction, Infrastructure
Post-Bid
$222,000 CJ est. value
Macclenny, FL 32063

Three (3) New Construction Site-built Homes Including Three Well and Septic Systems
New Construction, Infrastructure
Post-Bid
$80,000 CJ est. value
Macclenny, FL 32063

Sanderson Fire Station (Site Work Only)
Infrastructure
Results
$446,690 CJ est. value
Sanderson, FL 32087

Sanderson Fire Station (Building Only)
New Construction, Infrastructure - 7,000 SF
Results
$948,244 CJ est. value
Glen Saint Mary, FL 32040

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Plant Agricultural Systems Hydroponics Facility
New Construction, Infrastructure - 8,100,000 SF
Pending Verification
$750,000,000 CJ est. value
Sanderson, FL 32087

Well and Septic Systems
Infrastructure
Post-Bid
$30,000 CJ est. value
Sanderson, FL 32087

CR 125 Box Culvert Extensions
Infrastructure
Results
$1,171,741 CJ est. value
Glen Saint Mary, FL 32040

CR 125 Widening and Resurfacing North From Blair Circle South to Park Street
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Macclenny, FL 32063

CR 127 North Phase II Road Paving - From CR 120 to Moccasin Creek Cir
Infrastructure
Results
$4,931,162 CJ est. value
Sanderson, FL 32087

Covered Play Court
New Construction, Infrastructure
Post-Bid
$6,227,936 CJ est. value
Macclenny, FL 32063

Paving of Reid Stafford Rd Phase 3 from Smokey Rd to Horseshoe Loop
Infrastructure
Results
$156,927 CJ est. value
Sanderson, FL 32040

Sanderson Fire Station Well
Infrastructure
Post-Bid
$927,000 CJ est. value
Sanderson, FL 32087

St. Marys Cove Boat Ramp Phase 1
Infrastructure
Results
$331,160 CJ est. value
Macclenny, FL 32063

Reported 09/22/2023 12:00 AM
Project Title

Baker County Transportation Facility Bus Wash Building

Physical Address View project details and contacts
City, State (County) Macclenny, FL 32063   (Baker County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Competitive Bids
Project Status Bidding,
Bids Due View project details and contacts
Estimated Value $478,093 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work consists of a new facility to be constructed as the Baker County Bus Wash and includes, but is not limited to, the following major features included as the Base Bid, and more fully described by the contract document drawings and project manual: 1. One-story building consisting of a Bus Wash and storage area consisting of masonry block and steel structure. 2. Associated onsite site work including selective demolition, tree removal, earthwork, bus and automobile parking areas, paving, and sidewalks, perimeter screen walls, retaining walls, retention areas, and utilities. 3. Associated offsite site work including paving and utility connection work occurring in the right-of-way. 4. Landscaping and irrigation. This project is being partially funded through the American Recovery and Reinvestment Act of 2009 (ARRA) and as such shall be subject to all Federal Requirements as provided in the Bid Documents. Disadvantaged Business Enterprise (DBE) participation is encouraged in the contracting of this work and reporting may be required by the successful bidder. Baker County reserves the right to accept or reject any or all bids/proposals, waive minor formalities, and to award the bid/proposal that best serves the interests of Baker County. Baker County also reserves the right to award the base bids and any alternate bids in any combination that best suits the needs of the County. All technical questions relative to this project must be submitted in writing to Sara Little email at sara.little@bakercountyfl.org no later than 5:00 p.m. September 14, 2023. 23-195

Details

1,016 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents