Similar Projects
RFP Design - Design Plans for Pickles Butte Sanitary Landfill Gas Collection Project
Alteration
Conception
Boise, ID

Brundage Estates Residential Subdivision
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Meridian, ID 83642

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Design
$4,181,379 CJ est. value
Boise, ID 83706

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

Creason Pathway Construction
Infrastructure
Post-Bid
Meridian, ID

Prime Earth Pit Reclamation
Infrastructure
Post-Bid
Eagle, ID 83616

Barber Park Pathways and Bridges 2022
Renovation, Alteration
Results
Boise, ID 83716

Bull Meadow Sage-Grouse Habitat Improvement
Infrastructure
Results
$400,000 est. value
Boise, ID

Project Peregrine - FaceBook / Meta Data Center / Kuna
New Construction, Infrastructure - 960,000 SF
Construction
$800,000,000 CJ est. value
Kuna, ID 83634

Ann Morrison Park Drive / Multi Residential
New Construction, Infrastructure
Construction
$35,000,000 CJ est. value
Boise, ID 83706

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

Idaho Street Mixed-Use Building
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Boise, ID 83702

Cloverdale Road, Victory Road / Overland Road - Ada County Highway District
Infrastructure
Conception
$1,250,000 CJ est. value
Boise, ID 83709

Julia Davis River Node Memorial Construction
Infrastructure
Design
$600,000 CJ est. value
Boise, ID 83702

Spring Valley Phase 1 Grading
Infrastructure
Post-Bid
$300,000 est. value
Eagle, ID

Last Updated 05/30/2023 04:24 PM
Project Title

Centennial Marsh WMA Restoration

Physical Address View project details and contacts
City, State (County) Boise, ID 83702   (Ada County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $237,904 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of construction of new levees, ditches, and reconstruction of existing swales. Removal of an existing berm, excavating new breach locations, creating benches in Camas Creek, placing rip rap, gravel, and installing woody plantings.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents