Similar Projects
Last Updated | 06/23/2022 06:24 AM |
Project Title | Wastewater System Improvements |
Physical Address | View project details and contacts |
City, State (County) | Shawnee, OK (Pottawatomie County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $61,503,195 [brand] Estimate |
Plans Available from | Municipal Agency until 06/24/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A summary of the scope of work for the project include: Headworks facility with screening, grit removal and lift station (x2) 3 cell - 4.5 MGD Sequencing Batch Reactor WWTP 2 cell Aerobic Sludge Digesters w/ digested sludge pump station Ultraviolet Disinfection System in building Non-potable Water System in building High Efficiency Blowers in building Dual Belt Filter Press in building w/ sludge loading Miscellaneous Buildings - Operations / Control / Laboratory Facility / Electrical buildings Effluent Lift Station with Cascade Aeration Concrete lined Flow Equalization Basin w/ return Lift Station (x2) Associated piping, flow measurement and miscellaneous equipment with appurtenances Associated SCADA & Electrical systems with appurtenances Demolition of Existing WWTP (x2) 48,000 of 24 HDPE Forcemain 5,000 of 30 HDPE Forcemain The estimated construction cost of the project is $59,000,000. Funding for this project is provided through a Clean Water State Revolving Fund (CWSRF) Loan (ORF 20-0018-CWA) from the Oklahoma Water Resources Board (OWRB). As such, compliance with the Davis Bacon Act, American Iron and Steel, and Labor Standards Contract Provisions is mandatory. System for Award Management (SAM) registration is required for all contractors. Contractors desiring to submit a bid as a prime contractor for this project MUST submit their qualifications to the Owner and Engineer for approval. Contractors determined by Owner and Engineer to be qualified to perform the Work on the basis of their submitted qualifications will be notified that they have been prequalified for submitting a bid for the construction of the Project. Only prequalified bidders will be permitted to submit Bids for the construction project. Any Bids received from Bidders who were not prequalified will be returned unopened |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details | Water Treatment Plant, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |