Similar Projects
Pikeville to VA State Line; US-460/KY-80 From KY-195 to Dunleary Hollow. (Surfacing for Sections 6A and 6B)
Infrastructure
Conception
$31,500,000 CJ est. value
Pikeville, KY 41501

Pikeville to VA State Line; US-460/KY-80 From KY-195 to Dunleary Hollow. (Surfacing for Sections 6A and 6B)
Infrastructure
Conception
$31,500,000 CJ est. value
Pikeville, KY 41501

Improve KY 194 From US 119 Ramp Near Smith Farms Bottom (CR 1458) to Near Deskins Branch Culvert
Infrastructure
Design
$10,920,000 CJ est. value
Pikeville, KY 41501

Improve KY 194 From US 119 Ramp Near Smith Farms Bottom (CR 1458) to Near Deskins Branch Culvert
Infrastructure
Design
$10,920,000 CJ est. value
Pikeville, KY 41501

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Shelby Valley High School - Synthetic Turf Field Replacement
Renovation, Infrastructure
Post-Bid
Pikeville, KY 41501

Grade and Drain With Asphalt Surface- Mcveigh-Huddy Road (Ky 199)
Infrastructure
Results
Huddy, McVeigh, KY

US 23 - Pavement
Infrastructure
Results
KY

Agritech Research and Education Center - University of Pikeville
New Construction, Infrastructure
Pending Verification
$10,150,000 CJ est. value
Pikeville, KY 41501

Improve Safety and Reduce Congestion at the US-460 and KY-1460 Intersection
Infrastructure
Conception
$1,470,000 CJ est. value
Pikeville, KY 41501

Asphalt Surface With Grade & Drain
Infrastructure
Post-Bid
$2,707,414 CJ est. value
Pikeville, KY 41501

MP 3.315 - Flood Repair for Fema
Infrastructure
Results
KY

Improve Connectivity Between Thompson Road and US-23 at Stonecoal
Infrastructure
Conception
$6,960,000 CJ est. value
Pikeville, KY 41501

Elkhorn City Wastewater Collection Improvements Project
Infrastructure
Post-Bid
$876,000 CJ est. value
Elkhorn City, KY 41522

KY 611 and KY 1384 - Flood Repair For Fema
Infrastructure
Results
KY

Last Updated 04/04/2023 01:41 AM
Project Title

Pikeville to VA State Line: Improve US 460/KY 80 from Dunleary Hollow to KY 80 at Beaver Creek

Physical Address View project details and contacts
City, State (County) Pikeville, KY 41501   (Pike County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $69,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pikeville to VA State Line: Improve US 460/KY 80 from Dunleary Hollow to KY 80 at Beaver Creek (Section 6C) Bridge Only. (14CCN)(16CCR) Purpose and Need: Reliability / Relocation(O) Length .400 As of April 04, 2023, the project is in conceptual status. Anticipated Letting Year is 2024. KYTC - Pikeville to VA State Line: Improve US 460/KY 80 from Dunleary Hollow to KY 80 at Beaver Creek *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents