Similar Projects
Small Water Meter Replacement Program
Term Contract
Bidding
$2,500,000 est. value
FL

Valve Replacement Program - Phase 14
Infrastructure
Bidding
Venice, FL

Advanced Metering Infrastructure (AMI)
Post-Bid
Sarasota, FL 34230

Unit Price Contract for Small Pipeline
Term Contract
Post-Bid
Less than $5,000,000 est. value
Sarasota, FL 34230

Hillview Forcemain Extension and Midnight Pass Watermain Replacement
Results
$375,146 est. value
Sarasota, FL 34230

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Bayfront Park AC Water Main Replacement Siesta Drive AC Water Main Replacement 7
Results
Sarasota, FL 34236

Turtle Rock-McIntosh Reclaimed Water Main
Results
$503,593 est. value
Sarasota, FL 34230

Myakkahatchee Creek Water Treatment Plant to Ortiz Water Main
Results
North Port, FL

South Biscayne Drive and Pan American Boulevard Bridge Pipeline Replacements
Results
$538,357 est. value
North Port, FL 34287

Peace River Water Main Interconnect
Results
$17,786,340 est. value
Sarasota, FL 34230

San Mateo Potable Water Main
Results
North Port, FL 34286

Water Distribution System Improvements
Results
Less than $509,389 est. value
North Port, FL

West Venice Avenue Water Main Improvements
Results
$600,000 est. value
Venice, FL 34285

Nokomis Sewer Phase II
Results
FL

Last Updated 05/05/2021 05:55 AM
Project Title

Supply and Installation of Hydra-Stop Valve Services

Physical Address View project details and contacts
City, State (County) North Port, FL   (Sarasota County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To furnish and provide labor, materials, equipment and tools for the installation of Hydra-Stop Insta-Valve on 4” thru 12”, 16” and 20” watermains on an ‘as needed basis’. Pipe material varies and may include PVC, steel, cast iron, ductile iron and asbestos cement. Excavation and backfill of the worksite and provided dewatering as needed. The installation of Hydra-Stop insertion valves

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents