Similar Projects
Highway 47 and Highway 50 Intersection Development
Alteration
Design
$5,300,000 est. value
Union, MO 63084

Agricultural Building - Union R-XI School District
New Construction, Infrastructure - 20,000,000 SF
Design
$5,400,000 CJ est. value
Union, MO 63084

Hendricks Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Robertsville, MO 63072

Hendricks Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Robertsville, MO 63072

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

PVC Conduit
Infrastructure
Post-Bid
Sullivan, MO

2021 Fairgrounds Paving Improvements
Infrastructure
Results
Washington, MO

2021 Ultrathin Bonded Wearing Course Program
Infrastructure
Results
Sullivan, MO

Lux Living South Kingshighway Boulevard Multi Residential
New Construction, Infrastructure
Pending Verification
$51,000,000 CJ est. value
Saint Louis, MO 63110

Lux Living South Kingshighway Boulevard Multi Residential
New Construction, Infrastructure
Pending Verification
$51,000,000 CJ est. value
Saint Louis, MO 63110

Aurora Estates Senior Living
New Construction, Infrastructure
Design
$11,200,000 CJ est. value
Pacific, MO 63069

Denton Road Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$1,200,000 CJ est. value
Pacific, MO 63069

Water Main Material
Infrastructure
Post-Bid
Sullivan, MO

Hot Mix Overlay-Thornton, Little Tavern, and Old Highway
Infrastructure
Results
MO

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Last Updated 09/30/2022 02:13 PM
Project Title

E. Springfield Road Improvements

Physical Address View project details and contacts
City, State (County) Oak Grove Village, MO 63080   (Franklin County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $1,189,224 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 20, 2022, project was awarded to N.B. West Contracting, awarded amount is $1,189,223.75. As of May 12, 2022 This project has not yet been awarded. A timeline for award has not yet been established. The Scope of Work includes pavement widening, pavement milling, earthwork, storm sewer, asphalt overlay, erosion control, pavement striping, traffic control and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. Oak Grove Village anticipates issuing notice to proceed in the early summer of 202 If you are not on the Plan Holders List, you will not receive any addenda issued. Hard copies will not be available for purchase. Bidders may make printed copies of the bid documents (plans, project manual, and a bid packet) at their own expense. Project and bidding questions shall be conducted exclusively via e-mail. Any questions regarding this project must be submitted to: mspalding@cochraneng.com, by 4:00 pm local time on April 20, 2022. No written questions after this date or any verbal questions will be recognized. A bid security in the amount of five percent (5%) of the bid amount must accompany each bid, in accordance with the Instructions to Bidders For a contractor to be awarded this project the contractor must have a fully responsive contractor questionnaire on file with the Missouri Highway and Transportation Commission at least 7 days prior to the bid opening date. All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 of the 2021 Missouri Standard Specifications for Highway Construction. No Second Tier Subcontracting will be allowed. The wage rates applicable to this project have been predetermined as required by law and are set forth in this specification. When Federal wage rates are applicable and included, this contract is subject to the "Work Hours Act of 1962", (P.L. 87-581: 76 Stat. 357) and implementing regulations. When state and federal wage rates are both required the higher of the two for each job classification shall be used. Effective January 1, 2009 and pursuant to RSMo 285.530 (1), No business entity or employer shall knowingly employ, hire for employment, or continue to employ an unauthorized alien to perform work within the state of Missouri. The successful bidder must submit a sworn affidavit and documentation affirming the business entity's enrollment and participation in the federal work authorization program and that all of its employees working for the contracted services are not illegal immigrants. Upon signing the contract, the successful contractor and any subcontractor performing the work shall provide a tenhour Occupational Safety and Health Administration (OSHA) construction safety program for their on-site employees within sixty (60) days of beginning work on the construction project. Oak Grove Village, Missouri hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. The DBE Contract Goal for this project is 12%, and DBE firms must be certified by MoDOT to attain credit towards this contract goal. There is no On the Job Trainee goal. The Owner Intends to Award the Contract to the Lowest, Responsive, Responsible Bidder. The Owner Reserves the Right to Reject Any and All Bids, and to Waive Any Irregularities in the Best Interest of the Owner With Modot's Consent. MODOT - East Springfield Road Improvement

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents