Similar Projects
Roofing Repair and Maintenance
Post-Bid

Roof Replacement
Alteration
Post-Bid
Greensboro, NC

Rooftop Unit Replacement and Installation - 21
Results
Greensboro, NC 27403

Roof Replacement Project of Merrick Hall
Results
Greensboro, NC 27405

Roof Replacement for Oakview Elementary School
Alteration
Post-Bid
High Point, NC 27265

Metal Roof Replacement of Goat and Sheep Barn
Results
Greensboro, NC 27405

Roofing Services for Buildings Across all Campus Locations
Term Contract
Post-Bid
Jamestown, NC

Roof Coating Project - GTCC CAM Building
Alteration
Results
Greensboro, NC

Reroof, Clean Gutters, Install Gutter Guards, and New Downspout Drainage at The Oaks
Infrastructure, Alteration
Post-Bid
Greensboro, NC

Johnston Street Global Roof Replacement
Alteration
Results
High Point, NC 27262

Music Building Roof Replacement
Alteration
Post-Bid
Greensboro, NC 27412

2021 Roof Replacement - Melvin C. Swann Jr. Middle School
Renovation
Results
Less than $200,000 est. value
Greensboro, NC 27405

UMCG - Stone Building Roof Replacement
Alteration
Post-Bid
Greensboro, NC 27412

Gym Roof Replacement
Alteration
Results
Oak Ridge, NC 27310

Arts and Science/Craig Hall Phase 2 Roof Replacement
Alteration
Post-Bid
Greensboro, NC

Last Updated 05/19/2022 07:39 AM
Project Title

Gym Roof Replacement

Physical Address View project details and contacts
City, State (County) Oak Ridge, NC 27310   (Guilford County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To furnish all materials and labor for the Gym Roof Replacement Project at Oak Ridge elementary School. Removal of the existing spray foam and built-up roofing system(s) down to the tectum decking. Roof size is approximately 9,000 sq. ft. The roofing system insulation shall be an isocyanate insulation with a ½” primed- gypsum overlayment board, sloped to drain from the center to new perimeter gutters. The replacement membrane assembly consists of the application of a fully-adhered PVC-KEE single-ply membrane. Work includes installation of a new perimeter edge metal and prefinished gutters

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents