Similar Projects
Correll Palms Apartments
New Construction
Conception
Titusville, FL

Apollo Crossroads Apartments & Mini-Storage
New Construction
Conception
Melbourne, FL

Saint Stephen's Way Affordable Housing
New Construction
Design
Melbourne, FL 32901

Diamond Bay Reserve
New Construction - 28,425 SF
Design
Cocoa Beach, FL

66 North Atlantic Mixed-Use Building
New Construction - 61,559 SF
Post-Bid
Cocoa Beach, FL 32931

Starbucks / Melbourne
Demolition, New Construction, Infrastructure - 2,503 SF
Post-Bid
$762,000 CJ est. value
Melbourne, FL 32901

DBEH 20-1563 Repair Lift Station Various
Renovation, Infrastructure
Results
$1,292,211 CJ est. value
Cape Canaveral, FL 32920

Demolition and Installation of New Pavilion at Stuart Park
Infrastructure
Results
$22,663 CJ est. value
Titusville, FL 32780

Paramount Riverfront Condominiums
New Construction - 160,000 SF
Construction
Melbourne, FL 32901

The Horizon at Sand Pointe - Phase 1
New Construction - 279,106 SF
Construction
Titusville, FL 32780

Orchid Lakes
New Construction
Pending Verification
Palm Bay, FL

Eau Gallie Office Park, Phase 6 - Makoto's Addition
Addition, Demolition, Renovation, Infrastructure - 3,913 SF
Pending Verification
$1,000,000 CJ est. value
Melbourne, FL 32934

Port Malabar Apartments
New Construction
Conception
Palm Bay, FL

Avery Eau Gallie
New Construction
Design
Melbourne, FL

Land Clearing Management
Term Contract, Infrastructure
Post-Bid
Melbourne, FL

Last Updated 04/28/2023 02:14 PM
Project Title

Arbours at Cocoa Landing Apartments

Physical Address View project details and contacts
City, State (County) Cocoa, FL 32926   (Brevard County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $65,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of 280 apartment units across 13 wood framed buildings. Direct all bids/inquiries to the general contractor.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents