Similar Projects
Downtown Streetscape Crosswalk Enhancements
Infrastructure
Conception
Santa Maria, CA

Compton Community College Visual & Performing Arts Building
New Construction
Conception
$9,000,000 to $10,000,000 est. value
Compton, CA 90221

UCI Ambulatory Care Center
New Construction
Design
Irvine, CA 92697

Z2GZ--Replace Building 32 Elevator for Safety | 570-21-800
Renovation
Design
$1,000,000 to $2,000,000 est. value
Fresno, CA 93703

Joslyn Senior Center Renovation
Renovation, Infrastructure
Bidding
$597,958 CJ est. value
Redlands, CA 92373

YOSE 228193, 228205, 228214, Tuolumne Meadows Electric Distribution Replacement
Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Tuolumne, CA 95379

Buildings D, E, H, G, L and SC Roof Repairs Project
Renovation
Sub-Bidding
$400,000 CJ est. value
Orange, CA 92869

New Traffic Signal Installation at Oakdale Road and Claratina Avenue
Addition, Demolition, New Construction, Infrastructure, Build-out, Renovation
Sub-Bidding
$377,570 CJ est. value
Modesto, CA 95357

FANUC Robot Tabletop Systems
Renovation, Alteration
Post-Bid
Bakersfield, CA 93314

Design-Build Services for Butte College New Science Building
New Construction, Infrastructure - 64,404 SF
Post-Bid
$66,802,763 est. value
Oroville, CA 95965

Evergreen Valley College Student Services Complex
New Construction - 71,000 SF
Results
$54,700,000 est. value
San Jose, CA 95135

Task Order Construction Agreement for Multiple Projects
New Construction
Results
Sacramento, CA 95819

Millbrae Serra Station
New Construction, Infrastructure - 294,000 SF
Pending Verification
$460,000,000 CJ est. value
Millbrae, CA 94030

Broadway Square Los Angeles / The Reef
Addition, Demolition, New Construction, Infrastructure - 149,593 SF
Pending Verification
$1,200,000,000 CJ est. value
Los Angeles, CA 90007

Compton Community College Student Housing
New Construction
Conception
$69,490,000 est. value
Compton, CA 90221

Last Updated 07/28/2022 03:15 PM
Project Title

Lake Tahoe Community College - Equipment Storage Facility

Physical Address View project details and contacts
City, State (County) South Lake Tahoe, CA 96150   (El Dorado County)
Category(s) Commercial, Education, Heavy and Highway
Sub-Category(s) College/University, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $2,683,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project no-:21-2111, U1382-925-221 Order- 7713787 The Project consists of: This project will include The Equipment Storage Facility consists of two prefabricated Clearspan fabric buildings located off of an existing non-paved road and will provide storage of maintenance and recreation vehicles and equipment. The scope is defined in two drawing volumes (Site work and building installation) with Base Scope and an Additive Alternate. Volume 1 Base scope is all site work. Inclusive of utilities, storm water treatment, asphalt, fencing, gates, lighting, generator and scope as shown on drawings. Construction of the foundations and slab for the Owner furnished storage buildings, interior installation of building systems including power, fire sprinklers and installation of District furnished lighting and heating. Provide pathways for future installation of plumbing and extension of power. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the Contract for the Work. A bid bond by an admitted surety insurer on the form provided by the District, cash, or a cashier's check or a certified check, drawn to the order of the Lake Tahoe Community College District , in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract , the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. All site work shall be performed from June 01, 2022 to October 14, 2022. Final building completion by December 31, 2022. Questions Due Thursday, May 11, 2022, Response Due Monday, May 16, 2022 (addendum, if required). All bid questions are to be emailed to Heather Cade at cade@ltcc.edu. Last day for questions is Wednesday, May 11 *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Groundwork, foundation, slab, and underground utilities shall be performed by October 14, 2022. Final Completion: All work shall be performed by January 31, 2023. No work shall occur during the following dates: o All groundwork ceases between October 15 through April 30 each year. o Additional dates may exist and will be coordinated in advance with the Contractor The Equipment Storage Facility includes a 7,080 sf District provided premanufactured fabric building by Clearspan. The building will store equipment and vehicles and will not be occupied. 2. The contractor will be responsible for all site work and interior fit-out as shown in Volume 1 of the drawings. This includes the extension of utilities and new utility connections. Site work includes a perimeter fence, vehicle and man-gates, site lighting, asphalt and storm water treatment. Interior scope includes the installation and connection of owner furnished lighting, heaters and overhead doors as well as scope shown in Volume 1 of the drawings. 3. The contractor will be responsible for erection and construction of the premanufactured building in Volume 2 of the drawings. Engineers estimate: $2,200,000. All site work shall be performed by October 14, 2022. Final building completion by January 31, 2022. Projected District Board Approval by Tuesday, July 19, 2022 Projected project start in July/August 2022

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Automatic Entrances, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Parking Control Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents