Similar Projects
Last Updated | 06/23/2023 08:37 AM |
Project Title | LED Lighting Conversion |
Physical Address | View project details and contacts |
City, State (County) | Grayling, MI 49738 (Crawford County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $342,900 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The anticipated start date is in September. The scope of the Crawford AuSable School District LED Lighting Conversion and will include all interior fixtures, and will include a combination of the following: i. Replacement of existing non-LED lamps. ii. Retrofitting of fixtures where possible to accommodate LED lamps and lamp replacement. iii. Installation of new fixtures where lamp replacement or retrofitting of the existing fixture is not feasible or is not preferred. iv. All linear fluorescent and PL type fixtures scheduled to be retrofitted must be direct wired with a Type B LED Linear Tube or Type B LED PL type lamp. Ballast compatible LED products, and all glass or all plastic type LED linear tubes are not acceptable. Only aluminum backed LED linear tubes are acceptable. v. Existing socket holders in the linear fluorescent fixtures that are scheduled to be retrofitted with LED linear tubes shall be replaced with new LED application approved socket holders. vi. Removal and proper disposal of ALL existing lighting fixture electronic ballasts and lamps. vii. Lighting controls shall be installed in certain areas throughout the school district. Please see the attached Controls Schedules for the total number and type of controls to be installed in each area in the various buildings. Specification sheets for the lighting controls products are included in this bid package. No alternatives shall be accepted regarding the type of controls to be installed. This LED conversion project shall be completed no later than November 30, 2023. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |