Similar Projects
Or42: Slater Crk - Hard Cash Ln and Slide Repair Project
Infrastructure
Results
$5,000,000 to $10,000,000 est. value
OR

North Williams Street Storm Improvements
Infrastructure
Results
Lebanon, OR 97355

US101: MP 348.45 NB Landslide Mitigation
Infrastructure
Results
OR

Albany and Corvallis Signal Improvements - Benton and Linn Counties
Alteration
Results
$1,000,000 to $2,000,000 est. value

Albany and Corvallis Signal Improvements - Benton and Linn Counties
Alteration
Results
$1,000,000 to $2,000,000 est. value

Stone Creek Golf Course Pond Restoration Project
Infrastructure
Results
$320,000 est. value
Oregon City, OR 97045

Fairview Creek Pipe Culvert Joint Repair
Infrastructure
Post-Bid
Gresham, OR

OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail
Term Contract, Alteration
Post-Bid
Hood River, OR

OR 214 - Johna Ln. - Fenne Ln. (Silverton) Sec. Silver Creek Falls Vidal Francis, Pm
Infrastructure
Results
$500,000 to $1,000,000 est. value
Silverton, OR

NW Cornell Road - NW 102nd Avenue to NW 113th Avenue
Alteration
Bidding
$7,000,000 to $10,000,000 est. value
OR

ADA Ramps - W Baseline Road
Alteration
Results
$300,000 to $400,000 est. value
OR

Last Updated 12/10/2021 05:37 AM
Project Title

Us30 at Graham Creek Mp 65.08 - 65.25 Project on the Lower Columbia River Highway (Rt. No. Us30) Near Marshland

Physical Address View project details and contacts
City, State (County) OR   (Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Req. approx. 310 ft2 temp. signs; 3 ea PCMS; 900 hrs flag.; 3 ea flag. sta. light.; 16,418 ft temp. striping; 4,630 ft temp. barr.; 4 ea temp. imp. atten.; 333 ea reflect. barr. pnls.; temp. roadbed & surf.; temp. wtr. mgmt. fac.; div. bridge; 1,230 ft sed. barr.; turb. mntr.; constr. surv. wrk.; 2,030 yd3 exc.; 1,500 yd2 geot.; 80 yd3 riprap; 11 ft pipe; shor., crib., & cofdam.; 800 yd3 str. exc.; 188 yd3 gran. str. bckfl.; 1,897 ft stl. piles; 82 ft PC reinf. conc. 3 sided str.; 193 ft PC pile cap; 262 ft2 PC wingwalls; 90 yd2 CPPR; 880 ton aggr. base; 360 ton ACP; 525 ft gd. rl.; 1,960 ft paint striping; 0.1 yd3 conc. in sign sup.; 43 lb stl. in sign sup.; 6 ft2 signs; bioslope; 0.8 acre weed ctrl.; 1.6 acre seeding; 90 ea shrubs; 5 ea trees; 0.5 yd3 bark mulch; 12 ea fish rck.; 260 yd3 strmbed. grvl.; 30 yd3 strmbed. sand. Completion Time: December 7, 2022. Classes of Work: either: A) Bridges and Structures, or B) Earthwork and Drainage

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents