Similar Projects
Last Updated | 12/10/2021 05:37 AM |
Project Title | Us30 at Graham Creek Mp 65.08 - 65.25 Project on the Lower Columbia River Highway (Rt. No. Us30) Near Marshland |
Physical Address | View project details and contacts |
City, State (County) | OR (Columbia County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $2,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Req. approx. 310 ft2 temp. signs; 3 ea PCMS; 900 hrs flag.; 3 ea flag. sta. light.; 16,418 ft temp. striping; 4,630 ft temp. barr.; 4 ea temp. imp. atten.; 333 ea reflect. barr. pnls.; temp. roadbed & surf.; temp. wtr. mgmt. fac.; div. bridge; 1,230 ft sed. barr.; turb. mntr.; constr. surv. wrk.; 2,030 yd3 exc.; 1,500 yd2 geot.; 80 yd3 riprap; 11 ft pipe; shor., crib., & cofdam.; 800 yd3 str. exc.; 188 yd3 gran. str. bckfl.; 1,897 ft stl. piles; 82 ft PC reinf. conc. 3 sided str.; 193 ft PC pile cap; 262 ft2 PC wingwalls; 90 yd2 CPPR; 880 ton aggr. base; 360 ton ACP; 525 ft gd. rl.; 1,960 ft paint striping; 0.1 yd3 conc. in sign sup.; 43 lb stl. in sign sup.; 6 ft2 signs; bioslope; 0.8 acre weed ctrl.; 1.6 acre seeding; 90 ea shrubs; 5 ea trees; 0.5 yd3 bark mulch; 12 ea fish rck.; 260 yd3 strmbed. grvl.; 30 yd3 strmbed. sand. Completion Time: December 7, 2022. Classes of Work: either: A) Bridges and Structures, or B) Earthwork and Drainage |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |