Similar Projects
BIA Gap Analysis
Demolition, Term Contract - 10,800 SF
Post-Bid
Bethel, AK

Boiler Safety Calibration and Inspection
Term Contract
Post-Bid
Eielson AFB, AK 99702

Perform Modifications to the M/V Tustumena, including Temporary Services
Term Contract
Results
$5,000,000 to $10,000,000 est. value

Perform Modifications to the M/V Tustumena, including Temporary Services
Term Contract
Results
$5,000,000 to $10,000,000 est. value

Hangar Door Inspections & Maintenance
Term Contract
Post-Bid
JBER, AK

Fuel Storage and Distribution Points, Donnelly Training Area
Term Contract
Results
Delta Junction, AK

Construction Manager at Risk for the King Street Campus Upgrades
Alteration
Post-Bid
Anchorage, AK 99515

Provide Independent Marine Construction Reviewer Services
Infrastructure
Post-Bid
Anchorage, AK 99501

Underground Storage Tank Inspection
Term Contract
Post-Bid
Anchorage, AK

Manhole Inspection Program II
Term Contract
Post-Bid

Fire Alarm Testing/Extinguisher Inspections
Term Contract
Post-Bid
King Salmon, AK 99633

In-State Materials Sampling, Testing and Inspection Services
Term Contract
Post-Bid
$1,000,000 est. value
Anchorage, AK

Beluga Lake Dam Periodic Safety Inspection
Infrastructure
Post-Bid
$50,000 est. value
Homer, AK 99603

Reported 06/17/2022 12:00 AM
Project Title

Construction Administration and Inspection Services

Physical Address View project details and contacts
City, State (County) Petersburg, AK   (Wrangell-Petersburg County)
Category(s) Professional Services
Sub-Category(s) Inspection Services
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Notice is hereby given that the Petersburg Borough will receive proposals for on-site construction administration and inspection services for the Culvert Replacement Project - Public Works Shop Yard. This project generally consists of the replacement of a failed 60" diameter steel drainage culvert with a new 120" diameter aluminum culvert. Length of the culvert is approximately 210 feet and depth of fill to the bottom of the new culvert will be approximately 40 feet. Duration of construction is estimated to be approximately 6 weeks and will likely commence in late June or early July of 2022. The selected On-Site Construction Administrator (OCA) will be under contract to the Petersburg Borough with contract terms to be negotiated and will function under the direction of the Borough's Public Works Director.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents