Similar Projects
Sidewalk and Curb Installation and Repair - Towtaid Park
Bidding
Leicester, MA

2021 Sudbury Road Crosswalk at Seven Star Lane and Oxbow Road
Bidding
Concord, MA

Pine Hill Access Road and Campus Improvements - Sub-Bid
Sub-Bidding
$1,466,000 est. value
Sherborn, MA

Common Street Parking Lot
Post-Bid
Lawrence, MA

Various Roads and Sidewalks Patching
Post-Bid
Ipswich, MA

Patton Road Sidewalk Improvements Project
Results
$275,000 est. value
Devens, MA

Walkway Repairs, Hillside Gardens 667-1
Results
$39,000 est. value
Gardner, MA 01440

Centro Las Americas Offices Parking Lot
Renovation - 5,304 SF
Construction
Worcester, MA 01608

Valley Court Resurfacing and ADA Improvements
Bidding
Lexington, MA

Thoreau House Site Trail Improvements
Post-Bid
$425,000 est. value
Concord, MA

Crescent Street Sidewalk Improvements
Results
$200,000 est. value
West Boylston, MA 01583

Lawrence High School Sidewalk Repair Project
Bidding
Lawrence, MA

Sidewalk Repairs
Post-Bid
$75,000 est. value
Somerville, MA

Sidewalk and ADA Improvements at Various Locations
Results
Less than $416,336 est. value

ADA Improvements
Infrastructure
Bidding
Winchester, MA

Last Updated 05/05/2021 10:54 AM
Project Title

Sidewalk and ADA Improvements at Various Locations

Physical Address View project details and contacts
City, State (County) (Essex, Middlesex, Worcester Counties)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,024,018
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule Of Operations - Fixed Price $5500","100." "500.000","Ft","Tree Trimming","102.1" "6.000","Ea","Tree Protection – Armoring & Pruning","102.511" "100.000","Ft","Tree And Plant Protection Fence","102.521" "1770.000","Cy","Unclassified Excavation","120.1" "50.000","Cy","Test Pit For Exploration","141.1" "1.000","Ea","Drainage Structure Removed","146." "20.000","Cy","Ordinary Borrow","150." "1100.000","Cy","Gravel Borrow","151." "3870.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "1.000","Ls","Inspection And Testing For Asbestos","182.1" "50.000","Ft","Removal Of Asbestos","182.2" "1.000","Ton","Disposal Of Treated Wood Products","184.1" "2.000","Ea","Catch Basin","201." "25.000","Ea","Drainage Structure Adjusted","220." "25.000","Ft","Drainage Structure Rebuilt","220.2" "1.000","Ea","Drainage Structure Change In Type","220.3" "5.000","Ea","Sanitary Structure Adjusted","220.7" "1.000","Ea","Frame And Cover","221." "5.000","Ea","Frame And Grate - Massdot Cascade Type","222.1" "4.000","Ea","Frame And Grate (Or Cover) Removed And Discarded","223.2" "5.000","Cy","Removal Of Drainage Structure Sediment","227.3" "50.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "8.000","Ft","12 Inch Reinforced Concrete Pipe","241.12" "20.000","Ft","8 Inch Corrugated Plastic (Polyethylene) Pipe","252.08" "26.000","Ea","Gate Box Adjusted","358." "180.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "2940.000","Sy","Pavement Micro Milling","415.3" "5610.000","Lb","Calcium Chloride For Roadway Dust Control","440." "720.000","Ton","Superpave Surface Course - 12.5 (Ssc - 12.5)","450.23" "360.000","Ton","Superpave Intermediate Course - 12.5 (Sic -12.5)","450.31" "640.000","Ton","Superpave Base Course - 37.5 (Sbc - 37.5)","450.42" "220.000","Ton","Hma For Patching","451." "870.000","Gal","Asphalt Emulsion For Tack Coat","452." "5640.000","Ft","Hma Joint Sealant","453." "70.000","Ton","Temporary Asphalt Patching","472." "240.000","Sy","Cement Concrete Pavement","476." "960.000","Ft","Granite Curb Type Vb - Straight","506." "550.000","Ft","Granite Curb Type Vb - Curved","506.1" "510.000","Ft","Granite Transition Curb For Pedestrian Curb Ramps - Straight","509." "400.000","Ft","Granite Transition Curb For Pedestrian Curb Ramps - Curved","509.1" "5.000","Ea","Granite Curb To Hot Mix Asphalt Berm Transition","509.21" "8.000","Ea","Granite Curb Inlet - Straight","514." "10.000","Ea","Granite Curb Corner Type a","516." "30.000","Ft","Hot Mix Asphalt Curb - Option","570." "30.000","Ft","Edging Removed And Reset","583." "1880.000","Ft","Curb Removed And Discarded","594." "5.000","Ea","Curb Corner Removed And Discarded","596." "10.000","Ft","Fence Removed And Stacked","669." "10.000","Ft","Fence Removed And Reset","670." "20.000","Ea","Silt Sack","697.1" "360.000","Sy","Cement Concrete Sidewalk","701." "10.000","Sy","Cement Concrete Sidewalk At Driveways","701.1" "760.000","Sy","Cement Concrete Pedestrian Curb Ramp","701.2" "120.000","Ton","Hot Mix Asphalt Sidewalk Or Driveway","702." "12.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "100.000","Cy","Loam Borrow","751." "640.000","Sy","Seeding","765." "6.000","Cy","Wood Chip Mulch","767.4" "370.000","Sf","Warning-Regulatory And Route Marker - Aluminum Panel (Type a)","832." "50.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "850.000","Hr","Roadway Flagger","850.41" "2090.000","Sf","Safety Signing For Traffic Management","852." "1010.000","Ft","Temporary Pedestrian Barricade","852.11" "15.000","Ea","Temporary Pedestrian Curb Ramp","852.12" "400.000","Ft","Temporary Barrier Removed And Reset","853.21" "60.000","Ft","Temporary Water-Filled Barrier","853.22" "720.000","Ft","Temporary Water-Filled Barrier Removed And Reset","853.221" "60.000","Ft","Temporary Barrier (Tl-3)","853.23" "133.000","Day","Truck Mounted Attenuator","853.403" "133.000","Day","Arrow Board","856." "3990.000","Day","Reflectorized Drum","859." "600.000","Ft","6 Inch Reflectorized White Line (Thermoplastic)","866.106" "4990.000","Ft","12 Inch Reflectorized White Line (Thermoplastic)","866.112" "850.000","Ft","6 Inch Reflectorized Yellow Line (Thermoplastic)","867.106" "30.000","Ft","12 Inch Reflectorized Yellow Line (Thermoplastic)","867.112" "10.000","Ea","Street Sign Removed And Reset","874.1" "10.000","Ea","Traffic Sign Removed And Reset","874.2" "10.000","Ea","Traffic Sign Removed And Stacked","874.4"

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents